Variance models for project financial risk analysis with applications to greenfield BOT highway projects

被引:27
|
作者
Chiara, Nicola [1 ]
Garvin, Michael J. [2 ]
机构
[1] Columbia Univ, Dept Civil Engn & Engn Mech, New York, NY 10027 USA
[2] Virginia Tech, Myers Lawson Sch Construct, Blacksburg, VA USA
关键词
Build-operate-transfer; Monte Carlo simulation; risk analysis; stochastic models;
D O I
10.1080/01446190802259027
中图分类号
F [经济];
学科分类号
02 ;
摘要
Assessment of BOT project financial risk is generally performed by combining Monte Carlo simulation with discounted cash flow analysis. The outcomes of this risk assessment depend, to a significant extent, upon the total project uncertainty, which aggregates aleatory and epistemic uncertainties of key risk variables. Unlike aleatory uncertainty, modelling epistemic uncertainty is a rather difficult endeavour. In fact, BOT epistemic uncertainty may vary according to the significant information disclosed during the concession period. Two properties generally characterize the stochastic behaviour of the uncertainty of BOT epistemic variables: (1) the learning property and (2) the increasing uncertainty property. A new family of Markovian processes, the Martingale variance model and the general variance model, are proposed as an alternative modelling tool for BOT risk variables. Unlike current stochastic models, the proposed models can be adapted to incorporate a risk analyst's view of properties (1) and (2). A case study, a hypothetical BOT transportation project, illustrates that failing to properly model a project's epistemic uncertainty may lead to a biased estimate of the project's financial risk. The variance models may support, guide and extend the thinking process of risk analysts who face the challenging task of representing subjective assessments of key risk factors.
引用
收藏
页码:925 / 939
页数:15
相关论文
共 50 条
  • [41] Risk analysis of schedule delays in international highway projects in Vietnam using a structural equation model
    Hong Anh Vu
    Viet Hung Cu
    Min, Lian Xing
    Wang, Jian Qiong
    ENGINEERING CONSTRUCTION AND ARCHITECTURAL MANAGEMENT, 2017, 24 (06) : 1018 - 1039
  • [42] A Study on Project Prioritisation and Operations Performance Measurements by the Analysis of Local Financial Investment Projects in Korea
    Shim, Heecheol
    Kim, Jaehwan
    SUSTAINABILITY, 2023, 15 (07)
  • [43] Attempt to compare risk analysis methods in a highway viaduct project of the penetrating Ghazaouet in Algeria
    Slimane, Faiza Kara
    Allal, Mohammed Amine
    INNOVATIVE INFRASTRUCTURE SOLUTIONS, 2020, 5 (02)
  • [44] Attempt to compare risk analysis methods in a highway viaduct project of the penetrating Ghazaouet in Algeria
    Faiza Kara Slimane
    Mohammed Amine Allal
    Innovative Infrastructure Solutions, 2020, 5
  • [45] Probabilistic approach to project-specific political risk analysis for mineral projects
    Minera Barrick Misquichilca SA, Lima, Peru
    不详
    Min. Eng., 2006, 1 (43-49):
  • [46] A downside risk analysis based on financial index tracking models
    Yu, L
    Zhang, SZ
    Zhou, XY
    STOCHASTIC FINANCE, 2006, : 213 - +
  • [47] Supply chain risk analysis with mean-variance models: a technical review
    Chiu, Chun-Hung
    Choi, Tsan-Ming
    ANNALS OF OPERATIONS RESEARCH, 2016, 240 (02) : 489 - 507
  • [48] Supply chain risk analysis with mean-variance models: a technical review
    Chun-Hung Chiu
    Tsan-Ming Choi
    Annals of Operations Research, 2016, 240 : 489 - 507
  • [49] Risk Appraisal in Engineering Infrastructure Projects: Examination of Project Risks Using Probabilistic Analysis
    Lai, Jane
    Zhang, Lihai
    Duffield, Colin
    Aye, Lu
    TRANSACTIONS ON ENGINEERING TECHNOLOGIES: SPECIAL ISSUE OF THE WORLD CONGRESS ON ENGINEERING AND COMPUTER SCIENCE 2013, 2014, : 687 - 701
  • [50] Time-cost estimation probabilistic model using MCS in quantitative risk analysis in BOT renewable energy projects
    Yaghubi, D.
    Dorodiyan, M.
    Adibi, M. A.
    INTERNATIONAL JOURNAL OF INDUSTRIAL ENGINEERING AND MANAGEMENT, 2022, 13 (04): : 250 - 264