共 48 条
- [21] CONSTRUCTION AND OPERATION OF HOT METAL PRE-TREATMENT EQUIPMENT IN KAKOGAWA-WORKS, KOBE-STEEL-LTD [J]. TETSU TO HAGANE-JOURNAL OF THE IRON AND STEEL INSTITUTE OF JAPAN, 1985, 71 : S948 - S948
- [22] THE RESULTS OF IMPROVEMENT IN THE SLAB CASTERS IN NO-2 STEELMAKING SHOP AT MIZUSHIMA-WORKS, KAWASAKI-STEEL-CORP .1. IMPROVEMENT OF OPERATIONAL CONDITIONS AND QUALITY OF PRODUCTS [J]. TETSU TO HAGANE-JOURNAL OF THE IRON AND STEEL INSTITUTE OF JAPAN, 1985, 71 (04): : S153 - S153
- [23] SYNCHRONIZED OPERATION BETWEEN CONTINUOUS-CASTING AND ROLLING PROCESSES IN THE NEW BILLET MILL OF MIZUSHIMA WORKS, KAWASAKI-STEEL-CORP [J]. TETSU TO HAGANE-JOURNAL OF THE IRON AND STEEL INSTITUTE OF JAPAN, 1988, 74 (07): : 1354 - 1361
- [24] REVAMPING OF REHEATING FURNACE AT HOT-ROLLING PLANT IN CHIBA WORKS, KAWASAKI STEEL CORP .1. MODIFICATION AND OPERATION OF REHEATING FURNACE AT NO 2 HOT STRIP MILL IN CHIBA WORKS, KAWASAKI STEEL CORP [J]. TETSU TO HAGANE-JOURNAL OF THE IRON AND STEEL INSTITUTE OF JAPAN, 1985, 71 : 1196 - 1196
- [25] TOTAL BAR AND ROD ROLLING INFORMATION-SYSTEM AT MIZUSHIMA WORKS, KAWASAKI STEEL CORP .1. THE OUTLINE OF TOTAL BAR AND ROD ROLLING INFORMATION-SYSTEM AT MIZUSHIMA WORKS, KAWASAKI-STEEL-CORP [J]. TETSU TO HAGANE-JOURNAL OF THE IRON AND STEEL INSTITUTE OF JAPAN, 1985, 71 (05): : S305 - S305
- [26] SMP AND ORP PROCESSES OF HOT METAL PRETREATMENT OF NIPPON-STEEL-CORP [J]. REVUE DE METALLURGIE-CAHIERS D INFORMATIONS TECHNIQUES, 1985, 82 (02): : 149 - 158
- [27] MODIFICATION OF FINISHING TRAIN AT NO-2 HOT STRIP MILL, CHIBA WORKS, KAWASAKI-STEEL-CORP .1. WORK ROLL SHIFT MILL AND ITS ACTUAL OPERATION [J]. TETSU TO HAGANE-JOURNAL OF THE IRON AND STEEL INSTITUTE OF JAPAN, 1986, 72 (12): : 1220 - 1220
- [29] THE CONSTRUCTION OF THE NEW REHEATING FURNACE FOR PLATE MILL IN CHIBA WORKS, KAWASAKI-STEEL-CORP .1. HIGH-PERFORMANCE CONTINUOUS REHEATING FURNACE IN CHIBA PLATE MILL, KAWASAKI-STEEL-CORP [J]. TETSU TO HAGANE-JOURNAL OF THE IRON AND STEEL INSTITUTE OF JAPAN, 1986, 72 (12): : 1181 - 1181