A model for resource-constrained project scheduling using adaptive PSO

被引:2
|
作者
Neetesh Kumar
Deo Prakash Vidyarthi
机构
[1] Jawaharlal Nehru University,School of Computer and Systems Sciences
来源
Soft Computing | 2016年 / 20卷
关键词
Particle swarm optimization; NP-hard; Heuristics ; Resource-constrained project scheduling problem; Makespan;
D O I
暂无
中图分类号
学科分类号
摘要
Resource-constrained project scheduling problem (RCPSP) is an important, but computationally hard problem. Particle swarm optimization (PSO) is a well-known and highly used meta-heuristics to solve such problems. In this work, a simple, effective and improved version of PSO i.e. adaptive-PSO (A-PSO) is proposed to solve the RCPSP. Conventional canonical PSO is improved at two points; during the particle’s position and velocity updation, due to dependent activities in RCPSP, a high possibility arises for the particle to become invalid. To overcome this, an important operator named valid particle generator (VPG) is proposed and embedded into the PSO which converts an invalid particle into a valid particle effectively with the knowledge of the in-degree and out-degree of the activities depicted by the directed acyclic graph. Second, inertia weight (ω)\documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$(\omega )$$\end{document} that plays a significant role in the quick convergence of the PSO is adaptively tuned by considering the effects of fitness value, previous value of ω\documentclass[12pt]{minimal} \usepackage{amsmath} \usepackage{wasysym} \usepackage{amsfonts} \usepackage{amssymb} \usepackage{amsbsy} \usepackage{mathrsfs} \usepackage{upgreek} \setlength{\oddsidemargin}{-69pt} \begin{document}$$\omega $$\end{document} and iteration counter. Performance of the model is evaluated on the standard benchmark data of the RCPSP problem. Results show the effectiveness of the proposed model in comparison to other existing state of the art model that uses heuristics/meta-heuristics. The proposed model has the potential to be applied to other similar problems.
引用
收藏
页码:1565 / 1580
页数:15
相关论文
共 50 条
  • [21] An evolutionary algorithm for resource-constrained project scheduling
    Hindi, KS
    Yang, HB
    Fleszar, K
    [J]. IEEE TRANSACTIONS ON EVOLUTIONARY COMPUTATION, 2002, 6 (05) : 512 - 518
  • [22] Resource-constrained project scheduling by simulated annealing
    Boctor, FF
    [J]. INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1996, 34 (08) : 2335 - 2351
  • [23] Hybrid genetic algorithm with adaptive abilities for resource-constrained multiple project scheduling
    Dai, T
    Kim, K
    Yokota, T
    Gen, M
    [J]. Proceedings of the Second International Conference on Information and Management Sciences, 2002, 2 : 440 - 440
  • [24] Hybrid genetic algorithm with adaptive abilities for resource-constrained multiple project scheduling
    Kim, KW
    Yun, YS
    Yoon, JM
    Gen, M
    Yamazaki, G
    [J]. COMPUTERS IN INDUSTRY, 2005, 56 (02) : 143 - 160
  • [25] A POLARIZED ADAPTIVE SCHEDULE GENERATION SCHEME FOR THE RESOURCE-CONSTRAINED PROJECT SCHEDULING PROBLEM
    Zamani, Reza
    [J]. RAIRO-OPERATIONS RESEARCH, 2012, 46 (01) : 23 - 39
  • [26] A two-phase GA model for resource-constrained project scheduling
    Chen, Po-Han
    Weng, Haijie
    [J]. AUTOMATION IN CONSTRUCTION, 2009, 18 (04) : 485 - 498
  • [27] A bi-objective model for robust resource-constrained project scheduling
    Al-Fawzan, MA
    Haouari, M
    [J]. INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2005, 96 (02) : 175 - 187
  • [28] Flexible Scheduling Approach for Resource-Constrained Project Scheduling Problems
    Liu, Shixin
    Tukel, Oya I.
    Rom, W.
    [J]. 2008 7TH WORLD CONGRESS ON INTELLIGENT CONTROL AND AUTOMATION, VOLS 1-23, 2008, : 3522 - +
  • [29] Multidirectional Scheduling Scheme in Resource-Constrained Project Scheduling Problem
    Yoosefzadeh, Hamid R.
    Tareghian, Hamed R.
    Farahi, Mohammad H.
    [J]. NAVAL RESEARCH LOGISTICS, 2014, 61 (01) : 44 - 55
  • [30] Flexible resource-constrained resource leveling project scheduling problem
    Yu, Xiao-Guang
    Zhan, De-Chen
    Nie, Lan-Shun
    Chu, Dian-Hui
    Xu, Xiao-Fei
    [J]. Jisuanji Jicheng Zhizao Xitong/Computer Integrated Manufacturing Systems, CIMS, 2010, 16 (09): : 1967 - 1976