共 50 条
- [45] Algorithm for Resource-constrained Project Scheduling Problem With Resource Transfer Time Lu, Zhi-Qiang (zhiqianglu@tongji.edu.cn), 2018, Science Press (44): : 1028 - 1036
- [46] The Proactive Resource-Constrained Project Scheduling Problem with Resource Transfer Times PROCEEDINGS OF THE 2019 INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND SYSTEMS MANAGEMENT (IESM 2019), 2019, : 642 - 647
- [47] A new approach for the multi-site resource-constrained project scheduling problem CENTERIS2019--INTERNATIONAL CONFERENCE ON ENTERPRISE INFORMATION SYSTEMS/PROJMAN2019--INTERNATIONAL CONFERENCE ON PROJECT MANAGEMENT/HCIST2019--INTERNATIONAL CONFERENCE ON HEALTH AND SOCIAL CARE INFORMATION SYSTEMS AND TECHNOLOGIES, 2019, 164 : 478 - 484
- [50] Heuristics and applications for resource-constrained project scheduling with minimal and maximal time lags INES'97 : 1997 IEEE INTERNATIONAL CONFERENCE ON INTELLIGENT ENGINEERING SYSTEMS, PROCEEDINGS, 1997, : 403 - 408