共 50 条
- [31] Fuzzy programming approach for a multi-objective single machine scheduling problem with stochastic processing time [J]. WORLD CONGRESS ON ENGINEERING 2008, VOLS I-II, 2008, : 1302 - +
- [33] An algorithm for a bi-objective parallel machine problem with eligibility, release dates and delivery times of the jobs [J]. IFAC PAPERSONLINE, 2016, 49 (12): : 1614 - 1619
- [34] A bi-objective mathematical model for an unrelated parallel machine scheduling problem with job-splitting [J]. JOURNAL OF THE FACULTY OF ENGINEERING AND ARCHITECTURE OF GAZI UNIVERSITY, 2022, 37 (04): : 2293 - 2307
- [35] Bi-objective optimization algorithms for joint production and maintenance scheduling: application to the parallel machine problem [J]. Journal of Intelligent Manufacturing, 2009, 20 : 389 - 400
- [37] Machine scheduling with stochastic release and processing times [J]. IFAC PAPERSONLINE, 2019, 52 (13): : 2116 - 2121