A bi-objective mathematical model for an unrelated parallel machine scheduling problem with job-splitting

被引:7
|
作者
Sarac, Tugba [1 ]
Tutumlu, Busra [2 ]
机构
[1] Eskisehir Osmangazi Univ, Fac Engn & Architecture, Ind Enginering Dept, TR-26480 Eskisehir, Turkey
[2] Kutahya Dumlupinar Univ, Fac Engn, Ind Enginering Deparment, TR-43100 Kutahya, Turkey
关键词
Unrelated Parallel Machine Scheduling Problem; Job-Splitting; Multi-objective programming; Matheuristic Algorithm; SEQUENCE;
D O I
10.17341/gazimmfd.967343
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Studies dealing with parallel machine scheduling problems generally assume that jobs are not split. However, splitting of jobs can offer opportunities such as delivering the jobs on time or evenly distributing the jobs to the machines. In this study, two different multi-objective mathematical models are proposed for the unrelated parallel machine scheduling problem without and with job-splitting. The first model is for the unrelated parallel machine scheduling problem without job-splitting and it was developed based on the model proposed by Sarac and Tutumlu [1]. In the second model, in which the jobs can split, besides the machines to which the jobs will be assigned and their order, it is also determined how the jobs will split and in which ratios the jobs will be processed on which machines. The objectives of both models are to minimize the completion time of the last job and the number of machines to be used. Multi-objective models were transformed into a single-objective structure with the epsilon constraint method. Randomly generated test problems were solved with the proposed models using the GAMS/Cplex solver, and the results were compared. Considering the problems for which the optimum solution is obtained, the first model found a solution in an average of 85% less time than the model in the literature [1], and the second model shortens the completion time of the last job in an average of 14%. In addition, a mathematical heuristic algorithm is proposed for solving large-size problems.
引用
收藏
页码:2293 / 2307
页数:16
相关论文
共 50 条
  • [1] Parallel machine scheduling considering a job-splitting property
    Kim, YD
    Shim, SO
    Kim, SB
    Choi, YC
    Yoon, HM
    [J]. INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2004, 42 (21) : 4531 - 4546
  • [2] Bi-objective Optimization in Identical Parallel Machine Scheduling Problem
    Bathrinath, Sankaranarayanan
    Sankar, S. Saravana
    Ponnambalam, S. G.
    Kannan, B. K. V.
    [J]. SWARM, EVOLUTIONARY, AND MEMETIC COMPUTING, PT I (SEMCCO 2013), 2013, 8297 : 377 - 388
  • [3] Unrelated parallel machine scheduling with job splitting
    Logendran, R
    Subur, F
    [J]. IIE TRANSACTIONS, 2004, 36 (04) : 359 - 372
  • [4] Modeling and solving for bi-objective cutting parallel machine scheduling problem
    Ronghua Meng
    Yunqing Rao
    Qiang Luo
    [J]. Annals of Operations Research, 2020, 285 : 223 - 245
  • [5] Modeling and solving for bi-objective cutting parallel machine scheduling problem
    Meng, Ronghua
    Rao, Yunqing
    Luo, Qiang
    [J]. ANNALS OF OPERATIONS RESEARCH, 2020, 285 (1-2) : 223 - 245
  • [6] A Pareto evolutionary algorithm approach to bi-objective unrelated parallel machine scheduling problems
    Chyu, Chiuh-Cheng
    Chang, Wei-Shung
    [J]. INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2010, 49 (5-8): : 697 - 708
  • [7] A Pareto evolutionary algorithm approach to bi-objective unrelated parallel machine scheduling problems
    Chiuh-Cheng Chyu
    Wei-Shung Chang
    [J]. The International Journal of Advanced Manufacturing Technology, 2010, 49 : 697 - 708
  • [8] A realistic variant of bi-objective unrelated parallel machine scheduling problem: NSGA-II and MOACO approaches
    Afzalirad, Mojtaba
    Rezaeian, Javad
    [J]. APPLIED SOFT COMPUTING, 2017, 50 : 109 - 123
  • [9] Solving a bi-objective unrelated parallel batch processing machines scheduling problem: A comparison study
    Shahidi-Zadeh, B.
    Tavakkoli-Moghaddam, R.
    Taheri-Moghadam, A.
    Rastgar, I.
    [J]. COMPUTERS & OPERATIONS RESEARCH, 2017, 88 : 71 - 90
  • [10] A decision model and method for the bi-objective parallel machine ScheLoc problem
    Wang, Yun
    Wu, Peng
    Cheng, Junheng
    [J]. 2020 7TH INTERNATIONAL CONFERENCE ON CONTROL, DECISION AND INFORMATION TECHNOLOGIES (CODIT'20), VOL 1, 2020, : 886 - 890