Modeling and solving a bi-objective airport slot scheduling problem

被引:29
|
作者
Androutsopoulos, Konstantinos N. [1 ]
Manousakis, Eleftherios G. [1 ]
Madas, Michael A. [2 ]
机构
[1] Athens Univ Econ & Business, Sch Business, Dept Management Sci & Technol, 76 Patiss Str, Athens 10434, Greece
[2] Univ Macedonia, Sch Informat Sci, Dept Appl Informat, Informat Syst & & Business ISeB Lab, 156 Egnatia Str, Thessaloniki 54636, Greece
关键词
Heuristics; Transportation; Multiple criteria analysis; Project scheduling; Airport slot allocation; METAHEURISTIC ALGORITHMS; ALLOCATION; SEARCH; OPTIMIZATION; RESOURCES;
D O I
10.1016/j.ejor.2019.12.008
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
The strategic airport slot allocation problem concerns the scheduling of airlines' requests for landings and take-offs at congested airports for a series of days within a given scheduling season. Relevant scheduling models dealing with the strategic airport slot allocation problem have employed various combinations of the total schedule displacement criterion with several variations of acceptability metrics. However, most variations of schedule displacement pursued in existing literature do not thoroughly capture the real-world scheduling practice, and, most importantly, do not guarantee the allocation of acceptable/tolerable or viable displacement among competing airlines' slot requests. In this paper, we propose the formulation of the strategic airport slot allocation problem as a bi-objective resource constrained project scheduling problem with partially renewable resources and non-regular objective functions. We employ two non-regular performance criteria: (i) the total earliness-tardiness and (ii) a dispersion measure aiming to alleviate over-displaced requests. A novel hybrid heuristic algorithm integrating the Objective Feasibility Pump (FP) algorithm with the Large Neighborhood Search technique (LNS) is proposed. We generate a set of new problem instances originating from the patterns of a data set of actual slot requests for a Greek Regional Airport (GRA) to assess the performance of the algorithm. The computational results indicate that the proposed algorithm is reasonably accurate, and it has the capability to approximate the entire efficient frontier of the problem. (C) 2019 Elsevier B.V. All rights reserved.
引用
收藏
页码:135 / 151
页数:17
相关论文
共 50 条
  • [1] Bi-objective airport slot scheduling considering scheduling efficiency and noise abatement
    Feng, Huilin
    Hu, Rong
    Wang, Deyun
    Zhang, Junfeng
    Wu, Chuntao
    [J]. TRANSPORTATION RESEARCH PART D-TRANSPORT AND ENVIRONMENT, 2023, 115
  • [2] Modeling and solving for bi-objective cutting parallel machine scheduling problem
    Meng, Ronghua
    Rao, Yunqing
    Luo, Qiang
    [J]. ANNALS OF OPERATIONS RESEARCH, 2020, 285 (1-2) : 223 - 245
  • [3] Modeling and solving for bi-objective cutting parallel machine scheduling problem
    Ronghua Meng
    Yunqing Rao
    Qiang Luo
    [J]. Annals of Operations Research, 2020, 285 : 223 - 245
  • [4] Artificial bee colony algorithm for solving a bi-objective job shop scheduling problem
    Zhang R.
    [J]. Advances in Information Sciences and Service Sciences, 2011, 3 (08): : 319 - 326
  • [5] Solving a bi-objective flowshop scheduling problem by pareto-ant colony optimization
    Pasia, Joseph M.
    Hartl, Richard F.
    Doerner, Karl F.
    [J]. ANT COLONY OPTIMIZATION AND SWARM INTELLIGENCE, PROCEEDINGS, 2006, 4150 : 294 - 305
  • [6] Solving and optimizing a bi-objective open shop scheduling problem by a modified genetic algorithm
    Ali Azadeh
    SeyedMorteza Goldansaz
    AmirHossein Zahedi-Anaraki
    [J]. The International Journal of Advanced Manufacturing Technology, 2016, 85 : 1603 - 1613
  • [7] Solving and optimizing a bi-objective open shop scheduling problem by a modified genetic algorithm
    [J]. Azadeh, Ali (aazadeh@ut.ac.ir), 1603, Springer London (85): : 5 - 8
  • [8] Solving and optimizing a bi-objective open shop scheduling problem by a modified genetic algorithm
    Azadeh, Ali
    Goldansaz, SeyedMorteza
    Zahedi-Anaraki, AmirHossein
    [J]. INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2016, 85 (5-8): : 1603 - 1613
  • [9] BI-OBJECTIVE COLLABORATIVE SCHEDULING OPTIMIZATION OF AIRPORT FERRY VEHICLE AND TRACTOR
    Zhao, P. X.
    Gao, W. Q.
    Han, X.
    Luo, W. H.
    [J]. INTERNATIONAL JOURNAL OF SIMULATION MODELLING, 2019, 18 (02) : 355 - 365
  • [10] On solving the bi-objective aircraft cargo loading problem
    Dahmani, Nadia
    Krichen, Saoussen
    [J]. 2013 5TH INTERNATIONAL CONFERENCE ON MODELING, SIMULATION AND APPLIED OPTIMIZATION (ICMSAO), 2013,