Financing and reliability analysis for schedules in the project calendar planning problem

被引:0
|
作者
E. A. Kazakovtseva
V. V. Servakh
机构
[1] Omsk State University,Omsk Branch of Sobolev Institute of Mathematics, Siberian Branch
[2] Russian Academy of Sciences,undefined
来源
关键词
Income; Interest Rate; Remote Control; Time Moment; Investment Project;
D O I
暂无
中图分类号
学科分类号
摘要
We continue our earlier studies of the profit maximization problem in calendar planning of investment projects taking into account reinvesting of the obtained revenue and possible credit financing. We construct the corresponding model and describe a situation when only part of the jobs is financed with own money and credits, and the rest is raised by reinvesting the revenue. We study the calendar planning problem where incomes from various jobs are random values. We study the risks related both to getting a smaller income than expected and to failing a project. We propose an approach to estimate the reliability of job schedules.
引用
收藏
页码:1231 / 1240
页数:9
相关论文
共 50 条
  • [41] Improving Planning Reliability and Project Performance Using the Reliable Commitment Model
    Gonzalez, Vicente
    Alarcon, Luis F.
    Maturana, Sergio
    Mundaca, Fernando
    Bustamante, Jose
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 2010, 136 (10): : 1129 - 1139
  • [42] Budget impact analysis for implementation decision making, planning, and financing
    Smith, Natalie Riva
    Levy, Douglas E.
    TRANSLATIONAL BEHAVIORAL MEDICINE, 2024, 14 (01) : 54 - 59
  • [43] Bicriteria problem of discrete optimization in planning a multiunit construction project
    Podolski, Michal
    3RD SCIENTIFIC CONFERENCE ENVIRONMENTAL CHALLENGES IN CIVIL ENGINEERING (ECCE 2018), 2018, 174
  • [44] Optimizing construction planning schedules by virtual prototyping enabled resource analysis
    Li, Heng
    Chan, Neo
    Huang, Ting
    Guo, H. L.
    Lu, Weisheng
    Skitmore, Martin
    AUTOMATION IN CONSTRUCTION, 2009, 18 (07) : 912 - 918
  • [45] SEMIACTIVE, ACTIVE, AND NON-DELAY SCHEDULES FOR THE RESOURCE-CONSTRAINED PROJECT SCHEDULING PROBLEM
    SPRECHER, A
    KOLISCH, R
    DREXL, A
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1995, 80 (01) : 94 - 102
  • [46] AN APPLICATION OF RELIABILITY ANALYSIS TO A PROBLEM OF COMMUNICATIONS
    WEINGART.LB
    OPERATIONS RESEARCH, 1966, S 14 : B199 - &
  • [48] Multicriteria analysis in project selection problem
    Nowak, M
    8TH INTERNATIONAL CONFERENCE ON MODERN BUILDING MATERIALS, STRUCTURES AND TECHNIQUES, 2004, : 236 - 241
  • [49] AN ANALYSIS OF A DYNAMIC PROJECT COST PROBLEM
    MEHREZ, A
    SNIEDOVICH, M
    JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, 1992, 43 (06) : 591 - 604
  • [50] Time-cost tradeoff analysis with minimized project financing cost
    Alavipour, S. M. Reza
    Arditi, David
    AUTOMATION IN CONSTRUCTION, 2019, 98 : 110 - 121