Financing and reliability analysis for schedules in the project calendar planning problem

被引:0
|
作者
E. A. Kazakovtseva
V. V. Servakh
机构
[1] Omsk State University,Omsk Branch of Sobolev Institute of Mathematics, Siberian Branch
[2] Russian Academy of Sciences,undefined
来源
关键词
Income; Interest Rate; Remote Control; Time Moment; Investment Project;
D O I
暂无
中图分类号
学科分类号
摘要
We continue our earlier studies of the profit maximization problem in calendar planning of investment projects taking into account reinvesting of the obtained revenue and possible credit financing. We construct the corresponding model and describe a situation when only part of the jobs is financed with own money and credits, and the rest is raised by reinvesting the revenue. We study the calendar planning problem where incomes from various jobs are random values. We study the risks related both to getting a smaller income than expected and to failing a project. We propose an approach to estimate the reliability of job schedules.
引用
收藏
页码:1231 / 1240
页数:9
相关论文
共 50 条
  • [31] The reliability analysis of a Major Dam Project
    Barneich, J
    Majors, D
    Moriwaki, Y
    Kulkarni, R
    Davidson, R
    UNCERTAINTY IN THE GEOLOGIC ENVIRONMENT: FROM THEORY TO PRACTICE, VOLS 1 AND 2: PROCEEDINGS OF UNCERTAINTY '96, 1996, (58): : 1367 - 1382
  • [32] CENPES II project reliability analysis
    Calixto, E.
    Safety and Reliability for Managing Risk, Vols 1-3, 2006, : 2461 - 2468
  • [33] APPLICATION OF THE REI EQUIVALENT FOR OPERATIONS PLANNING ANALYSIS OF INTERCHANGE SCHEDULES
    OATTS, ML
    ERWIN, SR
    HART, JL
    IEEE TRANSACTIONS ON POWER SYSTEMS, 1990, 5 (02) : 547 - 555
  • [34] Measuring Executive Function (EF): Reliability and Validity of the Weekly Calendar Planning Activity in College Students
    Chu, Eddie
    Cermak, Sharon
    Nagata, Rashelle
    Smith, Creig
    Zhao, Jesse
    Goodfellow, Margaret
    AMERICAN JOURNAL OF OCCUPATIONAL THERAPY, 2019, 73 (04):
  • [35] Planning and analysis of measurement reliability studies
    Steiner, Stefan H.
    Stevens, Nathaniel T.
    Browne, Ryan
    Mackay, R. Jock
    CANADIAN JOURNAL OF STATISTICS-REVUE CANADIENNE DE STATISTIQUE, 2011, 39 (02): : 344 - 355
  • [36] Problem Analysis and Treatment Planning
    Schwarz, Daniela
    ZEITSCHRIFT FUR KLINISCHE PSYCHOLOGIE UND PSYCHOTHERAPIE, 2019, 48 (01): : 61 - 62
  • [37] PROJECT FEASIBILITY ANALYSIS FOR PLANNING IN BANGLADESH
    SEYFRIED, WR
    HABITAT INTERNATIONAL, 1988, 12 (04) : 151 - 169
  • [39] Comparative Analysis on BOT, PPP and ABS Project Financing Models
    Huang, Wenqian
    PROCEEDINGS OF THE 6TH INTERNATIONAL CONFERENCE ON ELECTRONIC, MECHANICAL, INFORMATION AND MANAGEMENT SOCIETY (EMIM), 2016, 40 : 1077 - 1082
  • [40] Improvement of the planning reliability by the integration of human skills in project risk management
    Marmier, Francois
    Cheikhrouhou, Naoufel
    Gourc, Didier
    PROCEEDINGS OF 2014 2ND IEEE INTERNATIONAL CONFERENCE ON LOGISTICS AND OPERATIONS MANAGEMENT (GOL 2014), 2014, : 125 - 132