Financing and reliability analysis for schedules in the project calendar planning problem

被引:0
|
作者
E. A. Kazakovtseva
V. V. Servakh
机构
[1] Omsk State University,Omsk Branch of Sobolev Institute of Mathematics, Siberian Branch
[2] Russian Academy of Sciences,undefined
来源
关键词
Income; Interest Rate; Remote Control; Time Moment; Investment Project;
D O I
暂无
中图分类号
学科分类号
摘要
We continue our earlier studies of the profit maximization problem in calendar planning of investment projects taking into account reinvesting of the obtained revenue and possible credit financing. We construct the corresponding model and describe a situation when only part of the jobs is financed with own money and credits, and the rest is raised by reinvesting the revenue. We study the calendar planning problem where incomes from various jobs are random values. We study the risks related both to getting a smaller income than expected and to failing a project. We propose an approach to estimate the reliability of job schedules.
引用
收藏
页码:1231 / 1240
页数:9
相关论文
共 50 条
  • [21] Financing Problem. Analysis of the Financing Means on the Basis of Balance Sheets
    Schiff, E.
    ZEITSCHRIFT FUR NATIONALOKONOMIE, 1937, 8 (03): : 400 - 401
  • [22] Project resource allocation optimization problem based on generalized resource calendar constraints
    Kong F.
    Si G.
    Guo J.-L.
    Kongzhi yu Juece/Control and Decision, 2024, 39 (05): : 1620 - 1628
  • [23] Generalized problem of calendar planning of a discrete manufacturing process. Part 2
    Uzdemir, A.P.
    Shmelev, V.V.
    Avtomatika i Telemekhanika, 1999, (04): : 103 - 110
  • [24] THE USE OF DYNAMIC-PROGRAMMING IN A DUAL APPROACH TO THE SOLUTION OF THE PROBLEM OF CALENDAR PLANNING
    KUKSA, AI
    LAPTIN, YP
    ENGINEERING CYBERNETICS, 1981, 19 (04): : 54 - 60
  • [25] A PROJECT IN EDUCATIONAL ANALYSIS AND PLANNING
    Friley, Charles E.
    Walker, Albert L.
    Gaskill, Harold V.
    JOURNAL OF EDUCATIONAL RESEARCH, 1943, 37 (04): : 241 - 250
  • [26] USE OF DYNAMIC PROGRAMMING IN A DUAL APPROACH TO THE SOLUTION OF THE PROBLEM OF CALENDAR PLANNING.
    KUKSA, A.I.
    LAPTIN, YU.P.
    1981, V 19 (N 4): : 54 - 60
  • [27] DIRECT AND INDIRECT FINANCING OF FAMILY PLANNING PROGRAMS - PROJECT GRANTS AND REIMBURSEMENT MECHANISMS
    SHULTZ, CS
    MARTIN, ML
    FAMILY PLANNING PERSPECTIVES, 1973, 5 (04): : 202 - 208
  • [28] Research of the ABC Analysis in Land Consolidation Project Financing
    Yang, Ming
    Si, Jingbo
    PROCEEDINGS OF THE 2010 INTERNATIONAL CONFERENCE ON INFORMATION TECHNOLOGY AND SCIENTIFIC MANAGEMENT, VOLS 1-2, 2010, : 908 - 910
  • [29] Analysis of Financing Plan for Real Estate Development Project
    Wu Tingting
    Hao Shengyue
    2007 INTERNATIONAL CONFERENCE ON WIRELESS COMMUNICATIONS, NETWORKING AND MOBILE COMPUTING, VOLS 1-15, 2007, : 3964 - 3967
  • [30] PLANNING AND MANAGEMENT OF THE OFFSHORE-RELIABILITY-DATA-PROJECT (OREDA)
    TOERHAUG, M
    RELIABILITY DATA COLLECTION AND USE IN RISK AND AVAILABILITY ASSESSMENT /, 1989, : 39 - 50