Single machine scheduling problems with sequence-dependent setup times and precedence delays

被引:0
|
作者
Shih-Wei Lin
Kuo-Ching Ying
机构
[1] Chang Gung University,Department of Information Management
[2] Keelung Chang Gung Memorial Hospital,Department of Emergency Medicine
[3] Ming Chi University of Technology,Department of Industrial Engineering and Management
[4] National Taipei University of Technology,Department of Industrial Engineering and Management
来源
关键词
D O I
暂无
中图分类号
学科分类号
摘要
Sequence-dependent setup times and precedence delays occur frequently in various production environments. This study investigates the single machine scheduling problem with setup times and precedence delays that occur in an amplifier assembly company. This study proposes a novel mixed-integer linear programming model and a lean iterated greedy algorithm to minimize the makespan for this problem. Based on the property of delayed precedence constraints, the lean iterated greedy (LIG) algorithm uses a simple but effective lean construction mechanism that can discard infeasible solutions to reduce the waste of unnecessary searches and quickly converge to the (near) global optimum. The computational results show that LIG significantly outperforms the state-of-the-art algorithm in terms of solution quality and computational efficiency. This study mainly contributes to providing a simple, effective, and efficient algorithm that can facilitate industrial applications and serve as a new benchmark approach for future research.
引用
收藏
相关论文
共 50 条
  • [31] Fast and efficient algorithms to handle the dynamism in a single machine scheduling problem with sequence-dependent setup times
    Angel-Bello, Francisco
    Vallikavungal, Jobish
    Alvarez, Ada
    COMPUTERS & INDUSTRIAL ENGINEERING, 2021, 152
  • [32] Exact solution of the single-machine scheduling problem with periodic maintenances and sequence-dependent setup times
    Nesello, Vitor
    Subramanian, Anand
    Battarra, Maria
    Laporte, Gilbert
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2018, 266 (02) : 498 - 507
  • [33] MULTI-OBJECTIVE UNRELATED PARALLEL MACHINES SCHEDULING WITH SEQUENCE-DEPENDENT SETUP TIMES AND PRECEDENCE CONSTRAINTS
    Tavakkoli-Moghaddam, R.
    Taheri, F.
    Bazzazi, M.
    INTERNATIONAL JOURNAL OF ENGINEERING, 2008, 21 (03): : 269 - 278
  • [34] Minimizing sum of completion times on a single machine with sequence-dependent family setup times
    Karabati, S
    Akkan, C
    JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, 2006, 57 (03) : 271 - 280
  • [35] A machine learning approach for flow shop scheduling problems with alternative resources, sequence-dependent setup times, and blocking
    Benda, Frank
    Braune, Roland
    Doerner, Karl F.
    Hartl, Richard F.
    OR SPECTRUM, 2019, 41 (04) : 871 - 893
  • [36] A machine learning approach for flow shop scheduling problems with alternative resources, sequence-dependent setup times, and blocking
    Frank Benda
    Roland Braune
    Karl F. Doerner
    Richard F. Hartl
    OR Spectrum, 2019, 41 : 871 - 893
  • [37] Two-machine robotic cell scheduling problem with sequence-dependent setup times
    Zarandi, M. H. Fazel
    Mosadegh, H.
    Fattahi, M.
    COMPUTERS & OPERATIONS RESEARCH, 2013, 40 (05) : 1420 - 1434
  • [38] Machine scheduling in the presence of sequence-dependent setup times and a rate-modifying activity
    Iranpoor, Mehdi
    Ghomi, S. M. T. Fatemi
    Zandieh, M.
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2012, 50 (24) : 7401 - 7414
  • [39] The distributionally robust machine scheduling problem with job selection and sequence-dependent setup times
    Bruni, M. E.
    Khodaparasti, S.
    Demeulemeester, E.
    COMPUTERS & OPERATIONS RESEARCH, 2020, 123
  • [40] ROLLING HORIZON PROCEDURES FOR DYNAMIC PARALLEL MACHINE SCHEDULING WITH SEQUENCE-DEPENDENT SETUP TIMES
    OVACIK, IM
    UZSOY, R
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1995, 33 (11) : 3173 - 3192