共 50 条
- [22] Minimizing total tardiness on a single machine with sequence-dependent setup times 2004 IEEE INTERNATIONAL CONFERENCE ON SYSTEMS, MAN & CYBERNETICS, VOLS 1-7, 2004, : 1481 - 1485
- [23] Hybrid metaheuristics for unrelated parallel machine scheduling with sequence-dependent setup times INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2009, 43 (1-2): : 161 - 169
- [24] Bicriteria scheduling of a two-machine flowshop with sequence-dependent setup times The International Journal of Advanced Manufacturing Technology, 2009, 40 : 1216 - 1226
- [25] Bicriteria scheduling of a two-machine flowshop with sequence-dependent setup times INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2009, 40 (11-12): : 1216 - 1226