A robust scheduling of projects with time, cost, and quality considerations

被引:0
|
作者
Ali Salmasnia
Hadi Mokhtari
Isa Nakhai Kamal Abadi
机构
[1] Tarbiat Modares University,Department of Industrial Engineering, Faculty of Engineering
关键词
Project scheduling; Time, cost, and quality trade-off; Robust approach; Multi-response;
D O I
暂无
中图分类号
学科分类号
摘要
Quality is one of the main pillars that should be effectively considered in managing of industrial projects. In traditional project scheduling problems, only the time and cost are considered without the quality parameters. In this paper, it is suggested that the quality parameter is embedded into the traditional time–cost trade-off problem to develop a time, cost, and quality trade-off problem (TCQTP) with some practical assumptions. To the best of our knowledge, this problem has not been extensively treated in literature yet. The contributions of this article are in threefold: (1) incorporating a practical assumption to the TCQTP that is a relaxation of deterministic assumption to stochastic ones, which no paper has ever attempted to consider it in TCQTP; (2) relaxing the linearity assumption of time function, cost function, and quality function to a general form; and (3) integrating the TCQTP with a robust solution method to minimize the variation effect on time, cost, and quality. Computational experiments, which were done on benchmark problem, show the applicability and good performance of suggested TCQTP.
引用
收藏
页码:631 / 642
页数:11
相关论文
共 50 条
  • [21] Time- and resource-based robust scheduling algorithms for multi-skilled projects
    Zhentao, Hu
    Nanfang, Cui
    Xuejun, Hu
    Mahaffey, M. A. Edgar
    AUTOMATION IN CONSTRUCTION, 2023, 153
  • [22] A fuzzy robust scheduling approach for product development projects
    Wang, J
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2004, 152 (01) : 180 - 194
  • [23] ARE COST CONSIDERATIONS CONTRADICTORY TO QUALITY
    SKINNER, DB
    ANNALS OF THORACIC SURGERY, 1995, 60 (05): : 1498 - 1499
  • [24] CONSIDERATIONS ON QUALITY COST MANAGEMENT
    Patrascan, Marius-Gabriel
    PROCEEDINGS OF THE 7TH INTERNATIONAL MANAGEMENT CONFERENCE: NEW MANAGEMENT FOR THE NEW ECONOMY, 2013, : 425 - 432
  • [25] Application of Three Metaheuristic Algorithms to Time-Cost-Quality Trade-Off Project Scheduling Problem for Construction Projects Considering Time Value of Money
    Kebriyaii, Omid
    Heidari, Ali
    Khalilzadeh, Mohammad
    Antucheviciene, Jurgita
    Pavlovskis, Miroslavas
    SYMMETRY-BASEL, 2021, 13 (12):
  • [26] Bi-Objective Scheduling Optimization for Discrete Time/Cost Trade-Off in Projects
    Li, Hongbo
    Xu, Zhe
    Wei, Wenchao
    SUSTAINABILITY, 2018, 10 (08)
  • [27] Fuzzy repetitive scheduling for construction projects considering risk preferences and time-cost tradeoffs
    Zou, Xin
    Zhang, Lihui
    ENGINEERING CONSTRUCTION AND ARCHITECTURAL MANAGEMENT, 2024,
  • [28] Scheduling Work Zones for Highway Maintenance Projects Considering a Discrete Time-Cost Relation
    Tang, Yimin
    Chien, Steven I-Jy
    TRANSPORTATION RESEARCH RECORD, 2008, (2055) : 21 - 30
  • [29] Application of slime mold algorithm to optimize time, cost and quality in construction projects
    Son, Pham Vu Hong
    Khoi, Luu Ngoc Quynh
    INTERNATIONAL JOURNAL OF CONSTRUCTION MANAGEMENT, 2024, 24 (13) : 1375 - 1386
  • [30] Group Decision Making for Stochastic Optimization of Time, Cost, and Quality in Construction Projects
    Heravi, Gholamreza
    Faeghi, Shiva
    JOURNAL OF COMPUTING IN CIVIL ENGINEERING, 2014, 28 (02) : 275 - 283