A robust scheduling of projects with time, cost, and quality considerations

被引:0
|
作者
Ali Salmasnia
Hadi Mokhtari
Isa Nakhai Kamal Abadi
机构
[1] Tarbiat Modares University,Department of Industrial Engineering, Faculty of Engineering
关键词
Project scheduling; Time, cost, and quality trade-off; Robust approach; Multi-response;
D O I
暂无
中图分类号
学科分类号
摘要
Quality is one of the main pillars that should be effectively considered in managing of industrial projects. In traditional project scheduling problems, only the time and cost are considered without the quality parameters. In this paper, it is suggested that the quality parameter is embedded into the traditional time–cost trade-off problem to develop a time, cost, and quality trade-off problem (TCQTP) with some practical assumptions. To the best of our knowledge, this problem has not been extensively treated in literature yet. The contributions of this article are in threefold: (1) incorporating a practical assumption to the TCQTP that is a relaxation of deterministic assumption to stochastic ones, which no paper has ever attempted to consider it in TCQTP; (2) relaxing the linearity assumption of time function, cost function, and quality function to a general form; and (3) integrating the TCQTP with a robust solution method to minimize the variation effect on time, cost, and quality. Computational experiments, which were done on benchmark problem, show the applicability and good performance of suggested TCQTP.
引用
收藏
页码:631 / 642
页数:11
相关论文
共 50 条
  • [31] Robust scheduling and robustness measures for the discrete time/cost trade-off problem
    Hazir, Oencue
    Haouari, Mohamed
    Erel, Erdal
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2010, 207 (02) : 633 - 643
  • [32] IMAGE QUALITY CONSIDERATIONS IN ESO TELESCOPE PROJECTS
    WILSON, RN
    OPTICA ACTA, 1982, 29 (07): : 985 - 992
  • [33] Shunting Engine Scheduling at Railway Technical Stations with Time Window, Waiting Cost and Outfit Considerations
    Zhao J.
    Liao D.
    Qi H.
    Peng Q.
    Tiedao Xuebao/Journal of the China Railway Society, 2024, 46 (05): : 18 - 29
  • [34] Time-cost-quality tradeoff considering resource-scheduling problems
    Elkliny, Ali F.
    Sanad, Haytham M.
    Etman, Emad E.
    AIN SHAMS ENGINEERING JOURNAL, 2023, 14 (11)
  • [35] The PDBO Algorithm for Discrete Time, Cost and Quality Trade - off in Software Projects with Expressing Quality by Defects
    Saif, Abdulelah
    Abbas, Safia
    Fayed, Zaki
    INTERNATIONAL CONFERENCE ON COMMUNICATIONS, MANAGEMENT, AND INFORMATION TECHNOLOGY (ICCMIT'2015), 2015, 65 : 930 - 939
  • [36] Incorporating quality considerations into project time/cost tradeoff analysis and decision making
    Pollack-Johnson, Bruce
    Liberatore, Matthew J.
    IEEE TRANSACTIONS ON ENGINEERING MANAGEMENT, 2006, 53 (04) : 534 - 542
  • [37] Time-cost-quality-risk Trade-off Project Scheduling Problem in Oil and Gas Construction Projects: Fuzzy Logic and Genetic Algorithm
    Banihashemi, Sayyid Ali
    Khalilzadeh, Mohammad
    JORDAN JOURNAL OF CIVIL ENGINEERING, 2022, 16 (02) : 355 - 364
  • [38] Time-cost-quality trade-off analysis for planning construction projects
    Wang, Tianqi
    Abdallah, Moatassem
    Clevenger, Caroline
    Monghasemi, Shahryar
    ENGINEERING CONSTRUCTION AND ARCHITECTURAL MANAGEMENT, 2021, 28 (01) : 82 - 100
  • [39] Robust scheduling with processing time uncertainty
    Honkomp, SJ
    Mockus, L
    Reklaitis, GV
    COMPUTERS & CHEMICAL ENGINEERING, 1997, 21 : S1055 - S1060
  • [40] Quality cost management model for construction projects
    Dolacek-Alduk, Zlata
    Radujkovic, Mladen
    Mikulic, Dunja
    GRADEVINAR, 2009, 61 (02): : 147 - 156