Revenue management approach to due date quoting and scheduling in an assemble-to-order production system

被引:0
|
作者
Hendrik Guhlich
Moritz Fleischmann
Raik Stolletz
机构
[1] University of Mannheim,
来源
OR Spectrum | 2015年 / 37卷
关键词
Revenue management; Due date quoting; Assemble-to-order; Assembly capacity; Scarce input materials;
D O I
暂无
中图分类号
学科分类号
摘要
In this paper, we consider demand management decisions for an assemble-to-order production system in which both the availability of intermediate material and assembly capacity are limited. For each incoming order, the manufacturer must decide whether to accept it and what due date to quote for an accepted order. The actual assembly dates are still subject to change after these decisions, and a production schedule must be maintained to guarantee that the quoted due dates are met. Therefore, the decisions on accepting orders and quoting due dates must be made with incomplete knowledge of the actual resources used to fulfill the orders. To address these factors, we model this situation and develop a novel revenue management approach using bid prices. An extensive numerical study demonstrates the good performance of the proposed approach in comparison with benchmark algorithms and an ex-post optimal solution applied over a wide range of different supply and demand scenarios. Our results suggest that the consideration of assembly capacity constraints is more vital than the consideration of intermediate material constraints in our test cases.
引用
收藏
页码:951 / 982
页数:31
相关论文
共 50 条
  • [11] Managing an Assemble-to-Order System with Returns
    DeCroix, Gregory A.
    Song, Jing-Sheng
    Zipkin, Paul H.
    [J]. M&SOM-MANUFACTURING & SERVICE OPERATIONS MANAGEMENT, 2009, 11 (01) : 144 - 159
  • [12] Production and Inventory Control of Assemble-to-Order Systems
    Saracalioilu, Nisa
    Sonbahar, Yigit
    Akdeniz, Guner Asrin
    Unsal, Meryem
    Yildiz, Yarkin Yigit
    Cakmakci, Salih Kaan
    Bulut, Onder
    Ozkan, Sinem
    Hokenek, Ceylin
    [J]. DIGITIZING PRODUCTION SYSTEMS, ISPR2021, 2022, : 757 - 771
  • [13] Integrated Service Management for Assemble-to-Order Manufacturing
    Mueller, Willibald
    [J]. PPS MANAGEMENT, 2008, 13 (04): : 45 - 48
  • [14] Delivery time dynamics in an assemble-to-order inventory and order based production control system
    Lin, Junyi
    Naim, Mohamed M.
    Spiegler, Virginia L. M.
    [J]. INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2020, 223
  • [15] Controlling and Optimization of On-time Delivery for Assemble-to-order Production System
    Pabolu, Venkata Krishna Rao
    Shrivastava, Divya
    Kulkarni, Makarand S.
    [J]. IFAC PAPERSONLINE, 2024, 57 : 161 - 166
  • [16] INFORMATION-SYSTEMS FOR ASSEMBLE-TO-ORDER PRODUCTION - AN APPLICATION
    WORTMANN, JC
    [J]. ENGINEERING COSTS AND PRODUCTION ECONOMICS, 1987, 12 (1-4): : 187 - 196
  • [17] A study on the assemble-to-order system with common component
    Zhang Yao
    Zhou Wei-hua
    [J]. GMC 13: PROCEEDINGS OF THE NINTH INTERNATIONAL SYMPOSIUM ON GLOBAL MANUFACTURING AND CHINA, 2013, : 1 - 5
  • [18] Dynamic capacity reservation and due date quoting in a make-to-order system
    Pibernik, Richard
    Yadav, Prashant
    [J]. NAVAL RESEARCH LOGISTICS, 2008, 55 (07) : 593 - 611
  • [19] Possibilistic programming in production planning of assemble-to-order environments
    Hsu, HM
    Wang, WP
    [J]. FUZZY SETS AND SYSTEMS, 2001, 119 (01) : 59 - 70
  • [20] Order acceptance and scheduling for precast production system considering due date assignment
    Xiong, Fuli
    Chu, Mengling
    [J]. Jisuanji Jicheng Zhizao Xitong/Computer Integrated Manufacturing Systems, CIMS, 2022, 28 (06): : 1790 - 1801