A study on the assemble-to-order system with common component

被引:0
|
作者
Zhang Yao [1 ]
Zhou Wei-hua [1 ]
机构
[1] Zhejiang Univ, Sch Management, Hangzhou 310058, Zhejiang, Peoples R China
关键词
ATO systems; component commonality; dynamic model; lead times; Markov decision process; numerical study;
D O I
暂无
中图分类号
F [经济];
学科分类号
02 ;
摘要
Component commonality has been widely recognized as an important way to achieve product variety at low cost. This topic has drawn lots of attention from researchers and most results are built primarily on static models (single-period models or multi-period, periodic-review models with zero lead times) and their results typically show that using common component can be beneficial and significant when the number of products increases, demand correlation decreases and the degree of commonality increases[1][2]. Unlike most of the studies on the component commonality problem before, we study a multi-product ATO system which has stochastic component lead times is positive and demand for the product takes place continuously over time according to an independent Poisson process. We formulate the problem as a Markov decision process and by conducting a series of numerical studies we find that some properties exist in the static models do not hold in dynamic circumstance anymore.
引用
下载
收藏
页码:1 / 5
页数:5
相关论文
共 50 条
  • [1] Dual-channel component replenishment problem in an assemble-to-order system
    Yao, Zhishuang
    Lee, Loo Hay
    Chew, Ek Peng
    Hsu, Vernon N.
    Jaruphongsa, Wikrom
    IIE TRANSACTIONS, 2013, 45 (03) : 229 - 243
  • [2] Joint inventory replenishment and component allocation optimization in an assemble-to-order system
    Akçay, Y
    Xu, SH
    MANAGEMENT SCIENCE, 2004, 50 (01) : 99 - 116
  • [3] Managing an Assemble-to-Order System with Returns
    DeCroix, Gregory A.
    Song, Jing-Sheng
    Zipkin, Paul H.
    M&SOM-MANUFACTURING & SERVICE OPERATIONS MANAGEMENT, 2009, 11 (01) : 144 - 159
  • [4] On component commonality for periodic review assemble-to-order systems
    Deza, Antoine
    Huang, Kai
    Liang, Hongfeng
    Wang, Xiao Jiao
    ANNALS OF OPERATIONS RESEARCH, 2018, 265 (01) : 29 - 46
  • [5] COMPONENT COMMONALITY IN ASSEMBLE-TO-ORDER SYSTEMS - MODELS AND PROPERTIES
    GERCHAK, Y
    HENIG, M
    NAVAL RESEARCH LOGISTICS, 1989, 36 (01) : 61 - 68
  • [6] On component commonality for periodic review assemble-to-order systems
    Antoine Deza
    Kai Huang
    Hongfeng Liang
    Xiao Jiao Wang
    Annals of Operations Research, 2018, 265 : 29 - 46
  • [7] The Impact of Demand Aggregation Through Delayed Component Allocation in an Assemble-to-Order System
    Bernstein, Fernando
    DeCroix, Gregory A.
    Wang, Yulan
    MANAGEMENT SCIENCE, 2011, 57 (06) : 1154 - 1171
  • [8] Demand Fulfillment in an Assemble-to-Order Production System
    Geier, Sebastian
    Fleischmann, Bernhard
    OPERATIONS RESEARCH PROCEEDINGS 2013, 2014, : 137 - 143
  • [9] Component commonality in multiple-period, assemble-to-order systems
    Hillier, MS
    IIE TRANSACTIONS, 2000, 32 (08) : 755 - 766
  • [10] Assemble-to-order manufacturing by the piece
    Schmidt, Paul-Gerhard
    PPS MANAGEMENT, 2007, 12 (04): : 51 - 54