Revenue management approach to due date quoting and scheduling in an assemble-to-order production system

被引:0
|
作者
Hendrik Guhlich
Moritz Fleischmann
Raik Stolletz
机构
[1] University of Mannheim,
来源
OR Spectrum | 2015年 / 37卷
关键词
Revenue management; Due date quoting; Assemble-to-order; Assembly capacity; Scarce input materials;
D O I
暂无
中图分类号
学科分类号
摘要
In this paper, we consider demand management decisions for an assemble-to-order production system in which both the availability of intermediate material and assembly capacity are limited. For each incoming order, the manufacturer must decide whether to accept it and what due date to quote for an accepted order. The actual assembly dates are still subject to change after these decisions, and a production schedule must be maintained to guarantee that the quoted due dates are met. Therefore, the decisions on accepting orders and quoting due dates must be made with incomplete knowledge of the actual resources used to fulfill the orders. To address these factors, we model this situation and develop a novel revenue management approach using bid prices. An extensive numerical study demonstrates the good performance of the proposed approach in comparison with benchmark algorithms and an ex-post optimal solution applied over a wide range of different supply and demand scenarios. Our results suggest that the consideration of assembly capacity constraints is more vital than the consideration of intermediate material constraints in our test cases.
引用
收藏
页码:951 / 982
页数:31
相关论文
共 50 条
  • [31] Conditional Lead-Time Flexibility in an Assemble-to-Order System
    Yu, Yi
    Deng, Tianhu
    Song, Jing-Sheng
    [J]. M&SOM-MANUFACTURING & SERVICE OPERATIONS MANAGEMENT, 2024,
  • [32] Asymptotically Optimal Control for an Assemble-to-Order System with Capacitated Component Production and Fixed Transport Costs
    Plambeck, Erica L.
    [J]. OPERATIONS RESEARCH, 2008, 56 (05) : 1158 - 1171
  • [33] Integrating decisions with advance supply information in an assemble-to-order system
    Chu, Jie
    Huang, Kai
    [J]. NAVAL RESEARCH LOGISTICS, 2020, 67 (01) : 34 - 44
  • [34] Managing an assemble-to-order system with after sales market for components
    Elhafsi, Mohsen
    Hamouda, Essia
    [J]. EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2015, 242 (03) : 828 - 841
  • [35] Approximation Methods for the Analysis of a Multicomponent, Multiproduct Assemble-to-Order System
    Fu, Ke
    Hsu, Vernon N.
    Lee, Chung-Yee
    [J]. NAVAL RESEARCH LOGISTICS, 2011, 58 (07) : 685 - 704
  • [36] Coordination with profit-sharing contracts in an assemble-to-order system
    Shao Xiao-feng
    Ji Jian-hua
    [J]. PROCEEDINGS OF THE 2006 INTERNATIONAL CONFERENCE ON MANAGEMENT SCIENCE & ENGINEERING (13TH), VOLS 1-3, 2006, : 476 - 480
  • [37] Distributed Feedback Control for Production, Inventory, and CO2 Emissions in an Assemble-To-Order System
    Lee, Seokgi
    Prabhu, Vittaldas
    [J]. SERVICE ORIENTATION IN HOLONIC AND MULTI-AGENT MANUFACTURING AND ROBOTICS, 2014, 544 : 15 - 29
  • [38] Order-fulfillment performance measures in an assemble-to-order system with stochastic leadtimes
    Song, JS
    Xu, SH
    Liu, B
    [J]. PROCEEDINGS OF THE 1996 MSOM CONFERENCE, 1996, : 241 - 245
  • [39] Optimal control of a high-volume assemble-to-order system
    Plambeck, Erica L.
    Ward, Amy R.
    [J]. MATHEMATICS OF OPERATIONS RESEARCH, 2006, 31 (03) : 453 - 477
  • [40] A hybrid push/pull system in assemble-to-order manufacturing environment
    Ghrayeb, Omar
    Phojanamongkolkij, Nipa
    Tan, Boon Aik
    [J]. JOURNAL OF INTELLIGENT MANUFACTURING, 2009, 20 (04) : 379 - 387