Risk assessment: method and case study for traffic projects

被引:0
|
作者
Yu X. [1 ]
Prevedouros P.D. [2 ]
机构
[1] KPMG LLP, 1601 Market Street, Philadelphia, 19128, PA
[2] Department of Civil and Environmental Engineering, University of Hawaii at Manoa, 2540 Dole Street, 383, Honolulu, 96822, HI
来源
Journal of Modern Transportation | 2017年 / 25卷 / 4期
关键词
Decision-making; Monte Carlo Simulation; Risk assessment; Traffic project; Uncertainty;
D O I
10.1007/s40534-017-0140-z
中图分类号
学科分类号
摘要
A comprehensive project evaluation and decision-making method considering multiple objectives, stakeholders, and attributes of proposed traffic treatments is inherently complicated. Although individual techniques in evaluating operations, safety, economic, and stakeholder objectives are available, a practical method that integrates all these risk factors and their uncertainties into a multi-attribute decision-making tool is absent. A three-level project decision-making process was developed to model and assess multiple-attribute risk in a proposed traffic treatment from the perspective of multiple stakeholders. The direct benefits from reducing delay and safety risk (basic objectives of traffic treatments) are computed in Level 1 with established methods. Feasibility and performance analysis in Level 2 examine site-specific constraints and conduct detailed performance analysis using advanced analysis tools. In Level 3, this paper introduces an innovative and integrated multiple attributes evaluation process under fuzziness and uncertainty (MAFU) process for evaluation and decision-making. The MAFU is a comprehensive and systematic assessment and decision-making procedure that can assess the magnitudes of project performance and to integrate conflicting interests and trade-offs among stakeholders. A case study illustrates the application of MAFU for the selection of a traffic alternative involving several evaluation attributes and stakeholders. Results show that the MAFU produced the smallest variance for each alternative. With traditional cost–benefit evaluation methods, the uncertainty associated with performance of a traffic project in terms of operation, safety, environmental impacts, etc., is unrestricted and cumulative. Therefore, a reliable multi-attribute evaluation of complex traffic projects should not be made with conventional cost–benefit analysis alone but with a process like MAFU. © 2017, The Author(s).
引用
收藏
页码:236 / 249
页数:13
相关论文
共 50 条
  • [21] An Integrated Method for Compliance and Risk Assessment Experiences from a Case Study
    Esayas, Samson
    Mahler, Tobias
    Seehusen, Fredrik
    Bjornstad, Frode
    Brubakk, Veda
    2015 IEEE CONFERENCE ON COMMUNICATIONS AND NETWORK SECURITY (CNS), 2015, : 568 - 576
  • [22] Quantitative Security Risk Assessment (SRA) Method: An empirical case study
    Bernardo, Danilo Valeros
    Chua, Bee Bee
    Hoang, Doan
    2009 WORLD CONGRESS ON NATURE & BIOLOGICALLY INSPIRED COMPUTING (NABIC 2009), 2009, : 971 - +
  • [23] Novel assessment and prediction method for vessel traffic risk degree
    Li, Bo
    PROCEEDINGS OF THE INSTITUTION OF MECHANICAL ENGINEERS PART O-JOURNAL OF RISK AND RELIABILITY, 2022, 236 (05) : 781 - 796
  • [24] Traffic accident risk assessment method for road network considering risk heterogeneity
    Cao Q.
    Li Z.-H.
    Tao P.-F.
    Ma Y.-J.
    Yang C.-X.
    Jilin Daxue Xuebao (Gongxueban)/Journal of Jilin University (Engineering and Technology Edition), 2023, 53 (10): : 2817 - 2825
  • [25] Managing risk in software development projects: a case study
    Dey, Prasanta Kumar
    Kinch, Jason
    Ogunlana, Stephen O.
    INDUSTRIAL MANAGEMENT & DATA SYSTEMS, 2007, 107 (1-2) : 284 - 303
  • [26] Risk Evaluation of the Reengineering Projects: A Case Study Analysis
    Shpak, Nestor
    Sorochak, Oleg
    Hvozd, Maryana
    Sroka, Wlodzimierz
    SCIENTIFIC ANNALS OF ECONOMICS AND BUSINESS, 2018, 65 (02) : 215 - 226
  • [27] Developing a risk assessment method for complex pipe jacking construction projects
    Cheng, Min
    Lu, Yujie
    AUTOMATION IN CONSTRUCTION, 2015, 58 : 48 - 59
  • [28] Application of a Fuzzy AHP Method to Risk Assessment of International Construction Projects
    Chen, Peihong
    Wang, Jiaqiong
    ECBI: 2009 INTERNATIONAL CONFERENCE ON ELECTRONIC COMMERCE AND BUSINESS INTELLIGENCE, PROCEEDINGS, 2009, : 459 - +
  • [29] Risk Assessment of Low-Speed Wind Power Projects Based on an Aggregated Cloud Method: A Case in China
    Wu, Yunna
    Ji, Shaoyu
    Wang, Jing
    Song, Zixin
    MATHEMATICAL PROBLEMS IN ENGINEERING, 2018, 2018
  • [30] Risk Assessment In Research Projects
    Schmidt, Roland
    ANNUAL RELIABILITY AND MAINTAINABILITY SYMPOSIUM, 2010 PROCEEDINGS, 2010,