Developing a risk assessment method for complex pipe jacking construction projects

被引:61
|
作者
Cheng, Min [1 ]
Lu, Yujie [2 ]
机构
[1] Shanghai Univ, Sch Management, Res Inst Engn & Project Management, Dept Management Sci & Engn, Shanghai, Peoples R China
[2] Natl Univ Singapore, Sch Design & Environm, Dept Bldg, Singapore 117548, Singapore
基金
中国国家自然科学基金;
关键词
Pipe jacking (PJ); Trenchless technology; Risk assessment; Failure mode and effect analysis (FMEA); Fuzzy inference; FAILURE MODE; EXISTING PIPELINES; PRIORITIZATION; FORCE; SEWER; FMEA;
D O I
10.1016/j.autcon.2015.07.011
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Pipe jacking (PJ) construction is a highly complex and uncertain process so that performing an accurate risk assessment is essential to the success of a project This study presents an innovative risk assessment model which combines fuzzy inference with failure mode and effect analysis (FMEA) to improve the effectiveness of existing risk assessment methods for pipe jacking construction. The proposed model maps the relationship between occurrence (O), severity(S), and detection (D) with the level of criticality of risk events in three steps: fuzzification, fuzzy rule-based inference, and defuzzification. A case study of a PJ construction project for water transmission in Shanghai, China is presented to demonstrate and validate the proposed method. A total of 31 potential risks was identified according to the PJ construction procedure and two-round Delphi questionnaire surveys. By using the proposed fuzzy-FMEA approach, the most critical risks in the PJ construction process can be identified, in particular, the shaft structure construction, jacking operation, and steel pipe segments welding. The proposed method overcomes the inherent weaknesses of traditional FMEA method and provides a reliable and distinguishable risk ranking system by properly reflecting the complexity of PJ construction environment The study also provides a comprehensive risk identification and evaluation tool for industrial practitioners who manage or involve with PJ construction projects. (C) 2015 Elsevier B.V. All rights reserved.
引用
收藏
页码:48 / 59
页数:12
相关论文
共 50 条
  • [1] PIPE JACKING METHOD FOR LONG CURVE CONSTRUCTION
    NOMURA, Y
    HOSHINA, H
    SHIOMI, H
    UMEZU, T
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 1985, 111 (02) : 138 - 148
  • [2] ENTERPRISE'S RISK ASSESSMENT OF COMPLEX CONSTRUCTION PROJECTS
    Konior, J.
    ARCHIVES OF CIVIL ENGINEERING, 2015, 61 (03) : 63 - 74
  • [3] Developing a multidimensional risk assessment model for sustainable construction projects
    Wuni, Ibrahim Yahaya
    ENGINEERING CONSTRUCTION AND ARCHITECTURAL MANAGEMENT, 2024,
  • [4] GEODETIC WORKS IN MICRO TUNNELING PROJECTS EXCAVATED BY PIPE-JACKING METHOD
    Ersoy, Nihat
    Yavuz, Erol
    11TH INTERNATIONAL MULTIDISCIPLINARY SCIENTIFIC GEOCONFERENCE (SGEM 2011), VOL II, 2011, : 255 - +
  • [5] The impact of pipe jacking method entrance and exit construction on the surrounding environment
    Qi Zongrun
    Liu Junyan
    Gong Ke
    2020 2ND INTERNATIONAL CONFERENCE ON CIVIL ENGINEERING, ENVIRONMENT RESOURCES AND ENERGY MATERIALS, 2021, 634
  • [6] CONSTRUCTION OF ELLIPTIC SECTIONAL UNDERPASS BY NEW PIPE JACKING METHOD.
    Takeshita, Sadao
    Quarterly Report of RTRI (Railway Technical Research Institute) (Japan), 1983, 24 (01): : 9 - 14
  • [7] A New Method for Predicting Ground Settlement Induced by Pipe Jacking Construction
    Niu, Zelin
    Cheng, Yun
    Zhang, Yuwei
    Song, Zhanping
    Yang, Guiyang
    Li, Hui
    MATHEMATICAL PROBLEMS IN ENGINEERING, 2020, 2020
  • [8] Control of settlement due to tunnel construction by slurry pipe jacking method
    Shimada, H
    Khazaei, S
    Matsui, K
    Kawai, T
    Yotsumoto, J
    Mining Science and Technology, 2004, : 377 - 382
  • [9] Sub-sea microtunnel by pipe jacking method - Construction challenges
    Ahmed, Syed Shakil
    Alfaour, Sam
    Al Ghanem, Mohammad
    UNDERGROUND SPACE - THE 4TH DIMENSION OF METROPOLISES, VOLS 1-3, 2007, : 1597 - 1601
  • [10] Relationship of jacking force and average friction with jacking path in pipe-jacking construction
    Xiang An-tian
    Zhu He-hua
    Ding Wen-qi
    ROCK AND SOIL MECHANICS, 2008, 29 (04) : 1005 - 1009