Developing a risk assessment method for complex pipe jacking construction projects

被引:61
|
作者
Cheng, Min [1 ]
Lu, Yujie [2 ]
机构
[1] Shanghai Univ, Sch Management, Res Inst Engn & Project Management, Dept Management Sci & Engn, Shanghai, Peoples R China
[2] Natl Univ Singapore, Sch Design & Environm, Dept Bldg, Singapore 117548, Singapore
基金
中国国家自然科学基金;
关键词
Pipe jacking (PJ); Trenchless technology; Risk assessment; Failure mode and effect analysis (FMEA); Fuzzy inference; FAILURE MODE; EXISTING PIPELINES; PRIORITIZATION; FORCE; SEWER; FMEA;
D O I
10.1016/j.autcon.2015.07.011
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Pipe jacking (PJ) construction is a highly complex and uncertain process so that performing an accurate risk assessment is essential to the success of a project This study presents an innovative risk assessment model which combines fuzzy inference with failure mode and effect analysis (FMEA) to improve the effectiveness of existing risk assessment methods for pipe jacking construction. The proposed model maps the relationship between occurrence (O), severity(S), and detection (D) with the level of criticality of risk events in three steps: fuzzification, fuzzy rule-based inference, and defuzzification. A case study of a PJ construction project for water transmission in Shanghai, China is presented to demonstrate and validate the proposed method. A total of 31 potential risks was identified according to the PJ construction procedure and two-round Delphi questionnaire surveys. By using the proposed fuzzy-FMEA approach, the most critical risks in the PJ construction process can be identified, in particular, the shaft structure construction, jacking operation, and steel pipe segments welding. The proposed method overcomes the inherent weaknesses of traditional FMEA method and provides a reliable and distinguishable risk ranking system by properly reflecting the complexity of PJ construction environment The study also provides a comprehensive risk identification and evaluation tool for industrial practitioners who manage or involve with PJ construction projects. (C) 2015 Elsevier B.V. All rights reserved.
引用
收藏
页码:48 / 59
页数:12
相关论文
共 50 条
  • [31] Ground Surface Settlement Induced by Large Diameter Jacking-pipe Construction in Pipe-roof Pre-construction Method
    Wang M.
    Yang S.
    Du J.
    Guo Y.
    Gongcheng Kexue Yu Jishu/Advanced Engineering Sciences, 2020, 52 (04): : 141 - 148
  • [32] Risk factors affecting the construction projects in the developing countries
    Bahamid, R. A.
    Doh, S., I
    Al-Sharaf, M. A.
    NATIONAL COLLOQUIUM ON WIND AND EARTHQUAKE ENGINEERING, 2019, 244
  • [33] An integrated risk assessment method for cross-regional mega construction projects
    Xiang, Pengcheng
    Xia, Xin
    Pang, Xianya
    ENGINEERING CONSTRUCTION AND ARCHITECTURAL MANAGEMENT, 2023, 31 (06) : 2369 - 2391
  • [34] Research of jacking force of densely arranged pipe jacks process in pipe-roof pre-construction method
    Yang, Songsong
    Wang, Mei
    Du, Jianan
    Guo, Yong
    Geng, Yan
    Li, Teng
    TUNNELLING AND UNDERGROUND SPACE TECHNOLOGY, 2020, 97
  • [35] Ground settlement caused by pipe-roof pre-construction method: Effect of the sequence of jacking pipe groups
    Yang, Song-song
    Zhang, Ding-wen
    Wang, Miao
    Xu, Jing-min
    Shen, Chen
    Zhang, Chao-zhe
    JOURNAL OF CENTRAL SOUTH UNIVERSITY, 2024, 31 (02) : 576 - 588
  • [36] Development of a Risk Assessment System for Construction Projects
    Patrinou, A. G.
    Chassiakos, A. P.
    PROCEEDINGS OF THE SEVENTH INTERNATIONAL CONFERENCE ON ENGINEERING COMPUTATIONAL TECHNOLOGY, 2010, 94
  • [37] Risk assessment methodology for underground construction projects
    Choi, HH
    Cho, HN
    Seo, JW
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2004, 130 (02) : 258 - 272
  • [38] Sustainability risk assessment in mega construction projects
    Coskun, Cansu
    Dikmen, Irem
    Birgonul, M. Talat
    BUILT ENVIRONMENT PROJECT AND ASSET MANAGEMENT, 2023, 13 (05) : 700 - 718
  • [39] THE METHODOLOGY OF RISK ASSESSMENT IN THE PLANNING OF CONSTRUCTION PROJECTS
    Szafranko, Elzbleta
    PROCEEDINGS OF THE 1ST INTERNATIONAL CONFERENCE CONTEMPORARY ISSUES IN THEORY AND PRACTICE OF MANAGEMENT: CITPM 2016, 2016, : 430 - 437
  • [40] Advancing Shallow Tunnel Construction in Soft Ground: The Pipe-Umbrella Box Jacking Method
    Jiang, Xi
    Zhang, Xuehui
    Zhang, Xiao
    Long, Luyuan
    Bai, Yun
    Huang, Baoshan
    TRANSPORTATION RESEARCH RECORD, 2024, 2678 (09) : 150 - 168