Risk assessment: method and case study for traffic projects

被引:0
|
作者
Yu X. [1 ]
Prevedouros P.D. [2 ]
机构
[1] KPMG LLP, 1601 Market Street, Philadelphia, 19128, PA
[2] Department of Civil and Environmental Engineering, University of Hawaii at Manoa, 2540 Dole Street, 383, Honolulu, 96822, HI
来源
Journal of Modern Transportation | 2017年 / 25卷 / 4期
关键词
Decision-making; Monte Carlo Simulation; Risk assessment; Traffic project; Uncertainty;
D O I
10.1007/s40534-017-0140-z
中图分类号
学科分类号
摘要
A comprehensive project evaluation and decision-making method considering multiple objectives, stakeholders, and attributes of proposed traffic treatments is inherently complicated. Although individual techniques in evaluating operations, safety, economic, and stakeholder objectives are available, a practical method that integrates all these risk factors and their uncertainties into a multi-attribute decision-making tool is absent. A three-level project decision-making process was developed to model and assess multiple-attribute risk in a proposed traffic treatment from the perspective of multiple stakeholders. The direct benefits from reducing delay and safety risk (basic objectives of traffic treatments) are computed in Level 1 with established methods. Feasibility and performance analysis in Level 2 examine site-specific constraints and conduct detailed performance analysis using advanced analysis tools. In Level 3, this paper introduces an innovative and integrated multiple attributes evaluation process under fuzziness and uncertainty (MAFU) process for evaluation and decision-making. The MAFU is a comprehensive and systematic assessment and decision-making procedure that can assess the magnitudes of project performance and to integrate conflicting interests and trade-offs among stakeholders. A case study illustrates the application of MAFU for the selection of a traffic alternative involving several evaluation attributes and stakeholders. Results show that the MAFU produced the smallest variance for each alternative. With traditional cost–benefit evaluation methods, the uncertainty associated with performance of a traffic project in terms of operation, safety, environmental impacts, etc., is unrestricted and cumulative. Therefore, a reliable multi-attribute evaluation of complex traffic projects should not be made with conventional cost–benefit analysis alone but with a process like MAFU. © 2017, The Author(s).
引用
收藏
页码:236 / 249
页数:13
相关论文
共 50 条
  • [31] Preliminary risk assessment in it projects
    Chernysheva, T. Y.
    INNOVATION MATERIALS AND MANUFACTURING TECHNOLOGIES, ECONOMIC ASPECTS IN ENTERPRISES, 2013, 379 : 220 - 223
  • [32] Risk assessment of option performance for new product and process development projects in the chemical industry: a case study
    Shaw, NE
    Burgess, TF
    De Mattos, C
    JOURNAL OF RISK RESEARCH, 2005, 8 (7-8) : 693 - 711
  • [33] Risk Assessment of Offshore Engineering Equipment Projects-A Case Study of Fall Pipe Vessel in China
    Zhao Jin-lou
    Cheng Yi-fei
    Li Zhao
    2011 INTERNATIONAL CONFERENCE ON MANAGEMENT SCIENCE AND ENGINEERING - 18TH ANNUAL CONFERENCE PROCEEDINGS, VOLS I AND II, 2011, : 994 - 1002
  • [34] Risk assessment in ERP projects
    Aloini, Davide
    Dulmin, Riccardo
    Mininno, Valeria
    INFORMATION SYSTEMS, 2012, 37 (03) : 183 - 199
  • [35] Economic Project Risk Assessment in Remediation Projects Prior to Construction: Methodology Development and Case Study Application
    Brinkhoff, Petra
    Norin, Malin
    Norrman, Jenny
    Rosen, Lars
    Ek, Kristine
    REMEDIATION-THE JOURNAL OF ENVIRONMENTAL CLEANUP COSTS TECHNOLOGIES & TECHNIQUES, 2015, 25 (02): : 117 - 138
  • [36] Probabilistic risk assessment of the energy saving shortfall in energy performance contracting projects-A case study
    Lee, P.
    Lam, P. T. I.
    Yik, F. W. H.
    Chan, E. H. W.
    ENERGY AND BUILDINGS, 2013, 66 : 353 - 363
  • [37] The Risk Assessment of Dam Construction Projects Using Fuzzy TOPSIS (Case Study: Alavian Earth Dam)
    Haghshenas, Sina Shaffiee
    Neshaei, Mir Ahmad Lashteh
    Pourkazem, Pouyan
    Haghshenas, Sami Shaffiee
    CIVIL ENGINEERING JOURNAL-TEHRAN, 2016, 2 (04): : 158 - 167
  • [38] A case study of regional risk assessment of river restoration projects: Nakdong River Basin, South Korea
    Kim, Jong-Suk
    Yoon, Sun-Kwon
    Choi, Minha
    Moon, Young-Il
    JOURNAL OF WATER AND CLIMATE CHANGE, 2015, 6 (03) : 628 - 637
  • [39] RISK ASSESSMENT OF CONSTRUCTION PROJECTS
    Zavadskas, Edmundas Kazimieras
    Turskis, Zenonas
    Tamosaitiene, Jolanta
    JOURNAL OF CIVIL ENGINEERING AND MANAGEMENT, 2010, 16 (01) : 33 - 46
  • [40] Traffic Revenue Risk Identification and Assessment in Build-Operate-Transfer Transport Projects in Vietnam
    Truong, Thi My Thanh
    Nguyen, Nga Thi
    CIGOS 2021, EMERGING TECHNOLOGIES AND APPLICATIONS FOR GREEN INFRASTRUCTURE, 2022, 203 : 1563 - 1572