Risk assessment: method and case study for traffic projects

被引:0
|
作者
Yu X. [1 ]
Prevedouros P.D. [2 ]
机构
[1] KPMG LLP, 1601 Market Street, Philadelphia, 19128, PA
[2] Department of Civil and Environmental Engineering, University of Hawaii at Manoa, 2540 Dole Street, 383, Honolulu, 96822, HI
来源
Journal of Modern Transportation | 2017年 / 25卷 / 4期
关键词
Decision-making; Monte Carlo Simulation; Risk assessment; Traffic project; Uncertainty;
D O I
10.1007/s40534-017-0140-z
中图分类号
学科分类号
摘要
A comprehensive project evaluation and decision-making method considering multiple objectives, stakeholders, and attributes of proposed traffic treatments is inherently complicated. Although individual techniques in evaluating operations, safety, economic, and stakeholder objectives are available, a practical method that integrates all these risk factors and their uncertainties into a multi-attribute decision-making tool is absent. A three-level project decision-making process was developed to model and assess multiple-attribute risk in a proposed traffic treatment from the perspective of multiple stakeholders. The direct benefits from reducing delay and safety risk (basic objectives of traffic treatments) are computed in Level 1 with established methods. Feasibility and performance analysis in Level 2 examine site-specific constraints and conduct detailed performance analysis using advanced analysis tools. In Level 3, this paper introduces an innovative and integrated multiple attributes evaluation process under fuzziness and uncertainty (MAFU) process for evaluation and decision-making. The MAFU is a comprehensive and systematic assessment and decision-making procedure that can assess the magnitudes of project performance and to integrate conflicting interests and trade-offs among stakeholders. A case study illustrates the application of MAFU for the selection of a traffic alternative involving several evaluation attributes and stakeholders. Results show that the MAFU produced the smallest variance for each alternative. With traditional cost–benefit evaluation methods, the uncertainty associated with performance of a traffic project in terms of operation, safety, environmental impacts, etc., is unrestricted and cumulative. Therefore, a reliable multi-attribute evaluation of complex traffic projects should not be made with conventional cost–benefit analysis alone but with a process like MAFU. © 2017, The Author(s).
引用
收藏
页码:236 / 249
页数:13
相关论文
共 50 条
  • [1] Risk assessment:method and case study for traffic projects
    Xin Yu
    Panos D.Prevedouros
    Journal of Modern Transportation, 2017, (04) : 236 - 249
  • [2] A Risk Assessment Model for Evaluating ERP Projects: a Case Study
    Wu Jianhong
    PROCEEDINGS OF THE 6TH EURO-ASIA CONFERENCE ON ENVIRONMENT AND CSR: SOCIETY AND TOURISM MANAGEMENT SESSION, PT II, 2010, : 8 - 13
  • [3] Effective Risk Assessment of Complicated EPC Projects: A Case Study of Wastewater Treatment Plant Projects
    Vo, Huy Minh
    Yang, Jyh-Bin
    Rangasamy, Veerakumar
    ASCE-ASME Journal of Risk and Uncertainty in Engineering Systems, Part A: Civil Engineering, 2025, 11 (02)
  • [4] Reliability-based risk assessment in coastal projects: Case study in Turkey
    Balas, CE
    Ergin, A
    JOURNAL OF WATERWAY PORT COASTAL AND OCEAN ENGINEERING, 2002, 128 (02) : 52 - 61
  • [5] Risk Manageability Assessment to Improve Risk Response Plan: Case Study of Construction Projects in Iran
    Charkhakan, Mohammad Hadi
    Heravi, Gholamreza
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2018, 144 (11)
  • [6] Study on Traffic Impact Assessment of Urban Road Construction Projects
    Wang, Miao-miao
    Wang, Jian-jun
    Liang, Hong-yan
    SUSTAINABLE CITIES DEVELOPMENT AND ENVIRONMENT PROTECTION, PTS 1-3, 2013, 361-363 : 1946 - 1949
  • [7] Study on the Traffic Safety Risk Assessment Method for Signalized At-Grade Intersection
    Lu, Feng
    Yang, Yadong
    CICTP 2020: ADVANCED TRANSPORTATION TECHNOLOGIES AND DEVELOPMENT-ENHANCING CONNECTIONS, 2020, : 3490 - 3501
  • [8] Risk Assessment in ERP Projects using an Integrated Method
    Jamshidi, Afshin
    Rahimi, Samira Abbasgholizadeh
    Ait-kadi, Daoud
    Rebaiaia, Mohamed Larbi
    Ruiz, Angel
    3RD INTERNATIONAL CONFERENCE ON CONTROL, ENGINEERING & INFORMATION TECHNOLOGY (CEIT 2015), 2015,
  • [9] Risk assessment in submarine outfall projects: The case of Portugal
    Mendonca, Ana
    Angel Losada, Miguel
    Reis, Maria Teresa
    Neves, Maria Graca
    JOURNAL OF ENVIRONMENTAL MANAGEMENT, 2013, 116 : 186 - 195
  • [10] Risk assessment in renewable energy projects: A case of Russia
    Chebotareva, Galina
    Strielkowski, Wadim
    Streimikiene, Dalia
    JOURNAL OF CLEANER PRODUCTION, 2020, 269