Risk Manageability Assessment to Improve Risk Response Plan: Case Study of Construction Projects in Iran

被引:18
|
作者
Charkhakan, Mohammad Hadi [1 ]
Heravi, Gholamreza [1 ]
机构
[1] Univ Tehran, Coll Engn, Sch Civil Engn, 16 Azar Ave,POB 11155-4563, Tehran, Iran
关键词
Risk management; Change management; Risk manageability; Change-formation path; Risk responses; Risk signs; Construction projects; EARLY WARNING SIGNS; MANAGEMENT;
D O I
10.1061/(ASCE)CO.1943-7862.0001562
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
The majority of qualitative risk assessment studies on construction projects assess manageability indicators (e.g.,detectability, preventability, and controllability) independently of risk probability and impact, two main risk parameters. This study develops a model for assessing the risk manageability indicators by linking manageability to the chain of risks. Such risk manageability indicators may improve risk response plans. The chain of risks in the change-formation phase is used as the basis to determine why any change in a construction project is generally caused by a chain of risks. Focus is directed to the chain of risks in the change-formation phase that determine part of the probability of change. In this phase, final risks (causes) that correspond to uncertain events occur because of the presence of sources and drivers. This model defines a risk scenario as all paths between a source and a risk (cause). Drivers in the paths between sources and final risk are the signs of risk scenarios. This study evaluates the manageability indicators by using the observability of drivers of the chain of risks to define and assess two indices of detectability and trackability as two main components of the developed framework. These indices are used to improve the response plan to mitigate risk. Finally, to demonstrate the framework capabilities, a real construction project as an application example is analyzed. This research contributes to the existing body of knowledge through evaluating the manageability of risk scenarios by defining the relationship between risk sources and risk signs (drivers). It also helps to expand existing knowledge by developing an approach for identifying and mitigating risk causes after the observation of risk signs. This evaluation may alert project management teams in advance of risk occurrence so that they can take necessary actions to reduce the probability of the risk. The results indicate that a project team should be aware that after observing a driver (risk sign) in a project, parts of previous paths in which no driver is observed may lose their importance, and that the importance of some paths in which observed drivers exist intensifies. Moreover, a project team's observations may sometimes reduce the importance of remaining paths and direct the team to concentrate on taking appropriate measures to enable immediate prevention from a scenario's endpoint (cause).
引用
收藏
页数:13
相关论文
共 50 条
  • [1] An Assessment of Risk Identification in Large Construction Projects in Iran
    Tadayon, Mehdi
    Jaafar, Mastura
    Nasri, Ehsan
    [J]. JOURNAL OF CONSTRUCTION IN DEVELOPING COUNTRIES, 2012, 17 : 57 - 69
  • [2] RISK ASSESSMENT OF CONSTRUCTION PROJECTS
    Zavadskas, Edmundas Kazimieras
    Turskis, Zenonas
    Tamosaitiene, Jolanta
    [J]. JOURNAL OF CIVIL ENGINEERING AND MANAGEMENT, 2010, 16 (01) : 33 - 46
  • [3] Risk assessment in construction projects of Iraq
    Alklkali, Ali Moosa Taqi
    [J]. JOURNAL OF ALGEBRAIC STATISTICS, 2022, 13 (01) : 517 - 525
  • [4] Risk Assessment in Bridge Construction Projects in Iran Using Monte Carlo Simulation Technique
    Naderpour, Hosein
    Kheyroddin, Ali
    Mortazavi, Seyedmehdi
    [J]. PRACTICE PERIODICAL ON STRUCTURAL DESIGN AND CONSTRUCTION, 2019, 24 (04)
  • [5] Risk assessment: method and case study for traffic projects
    Yu X.
    Prevedouros P.D.
    [J]. Journal of Modern Transportation, 2017, 25 (4): : 236 - 249
  • [6] Economic and Time Risk Factors Influencing the Construction Projects: A Case Study of Lebanese Construction Projects
    Ahmad, Omar
    Nouban, Fatemeh
    [J]. JORDAN JOURNAL OF CIVIL ENGINEERING, 2023, 17 (03) : 399 - 407
  • [7] Evaluation of environmental risk on urban construction projects : Case study
    Ren, Xuehui
    Zheng, Haixia
    Xia, Lin
    Zhang, Haijing
    [J]. PROCEEDINGS OF 2007 INTERNATIONAL CONFERENCE ON CONSTRUCTION & REAL ESTATE MANAGEMENT, VOLS 1 AND 2, 2007, : 702 - 704
  • [8] Risk response incorporating risk preferences in international construction projects
    Yan, Peng
    Liu, Junying
    Zhao, Xianbo
    Skitmore, Martin
    [J]. ENGINEERING CONSTRUCTION AND ARCHITECTURAL MANAGEMENT, 2022, 29 (09) : 3499 - 3519
  • [9] Development of a Risk Assessment System for Construction Projects
    Patrinou, A. G.
    Chassiakos, A. P.
    [J]. PROCEEDINGS OF THE SEVENTH INTERNATIONAL CONFERENCE ON ENGINEERING COMPUTATIONAL TECHNOLOGY, 2010, 94
  • [10] Identification and assessment of risk in construction projects using the integrated FMEA-SWARA-WASPAS model under fuzzy environment: a case study of a construction project in Iran
    Alvand, Abolfazl
    Mirhosseini, S. Mohammad
    Ehsanifar, Mohammad
    Zeighami, Ehsanollah
    Mohammadi, Amir
    [J]. INTERNATIONAL JOURNAL OF CONSTRUCTION MANAGEMENT, 2023, 23 (03) : 392 - 404