Multiple machine continuous setup lotsizing with sequence-dependent setups

被引:0
|
作者
Bernardo Almada-Lobo
Diego Klabjan
Maria Antónia Carravilla
José F. Oliveira
机构
[1] DEIG—Faculdade de Engenharia da Universidade do Porto,Department of Industrial Engineering and Management Sciences
[2] Northwestern University,Faculdade de Engenharia
[3] da Universidade do Porto,undefined
[4] Instituto de Engenharia de Sistemas e Computadores do Porto Campus da FEUP,undefined
关键词
Continuous setup lotsizing; Sequence-dependent setup; Integer programming; Lagrangian decomposition; Heuristics;
D O I
暂无
中图分类号
学科分类号
摘要
We address the short-term production planning and scheduling problem coming from the glass container industry. A furnace melts the glass that is distributed to a set of parallel molding machines. Both furnace and machine idleness are not allowed. The resulting multi-machine multi-item continuous setup lotsizing problem with a common resource has sequence-dependent setup times and costs. Production losses are penalized in the objective function since we deal with a capital intensive industry. We present two mixed integer programming formulations for this problem, which are reduced to a network flow type problem. The two formulations are improved by adding valid inequalities that lead to good lower bounds. We rely on a Lagrangian decomposition based heuristic for generating good feasible solutions. We report computational experiments for randomly generated instances and for real-life data on the aforementioned problem, as well as on a discrete lotsizing and scheduling version.
引用
收藏
页码:529 / 552
页数:23
相关论文
共 50 条
  • [41] Flexible flow shop with sequence-dependent setup times and machine availability constraints
    Javadian, Nikbakhsh
    Amiri-Aref, Mehdi
    Hadighi, Ali
    Kazemi, Mohammad
    Moradi, Alireza
    INTERNATIONAL JOURNAL OF MANAGEMENT SCIENCE AND ENGINEERING MANAGEMENT, 2010, 5 (03) : 219 - 226
  • [42] Single machine scheduling with sequence-dependent setup times and delayed precedence constraints
    Yiyo Kuo
    Sheng-I Chen
    Yen-Hung Yeh
    Operational Research, 2020, 20 : 927 - 942
  • [43] Hybrid metaheuristics for unrelated parallel machine scheduling with sequence-dependent setup times
    Chen, Chun-Lung
    Chen, Chuen-Lung
    INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2009, 43 (1-2): : 161 - 169
  • [44] Bicriteria scheduling of a two-machine flowshop with sequence-dependent setup times
    S. Afshin Mansouri
    S. Hamed Hendizadeh
    Nasser Salmasi
    The International Journal of Advanced Manufacturing Technology, 2009, 40 : 1216 - 1226
  • [45] Bicriteria scheduling of a two-machine flowshop with sequence-dependent setup times
    Mansouri, S. Afshin
    Hendizadeh, S. Hamed
    Salmasi, Nasser
    INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2009, 40 (11-12): : 1216 - 1226
  • [46] Order release and sequence-dependent setup times
    Missbauer, H
    INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 1997, 49 (02) : 131 - 143
  • [47] A bicriteria scheduling with sequence-dependent setup times
    Eren, Tamer
    Guner, Ertan
    APPLIED MATHEMATICS AND COMPUTATION, 2006, 179 (01) : 378 - 385
  • [48] Constraint Programming and constructive heuristics for parallel machine scheduling with sequence-dependent setups and common servers
    Heinz, Vilem
    Novak, Antonin
    Vlk, Marek
    Hanzalek, Zdenek
    COMPUTERS & INDUSTRIAL ENGINEERING, 2022, 172
  • [49] Intelligent controllers for bi-objective dynamic scheduling on a single machine with sequence-dependent setups
    Xanthopoulos, A. S.
    Koulouriotis, D. E.
    Tourassis, V. D.
    Emiris, D. M.
    APPLIED SOFT COMPUTING, 2013, 13 (12) : 4704 - 4717
  • [50] JOINT LOT SIZING AND SCHEDULING OF MULTIPLE ITEMS WITH SEQUENCE-DEPENDENT SETUP COSTS
    DILTS, DM
    RAMSING, KD
    DECISION SCIENCES, 1989, 20 (01) : 120 - 133