A bicriteria scheduling with sequence-dependent setup times

被引:35
|
作者
Eren, Tamer [1 ]
Guner, Ertan
机构
[1] Kirikkale Univ, Fac Engn, Dept Ind Engn, TR-71450 Kirikkale, Turkey
[2] Gazi Univ, Fac Engn & Architecture, Dept Ind Engn, TR-06570 Ankara, Turkey
关键词
single machine scheduling; sequence dependent setup times; bicriteria; 0-1 integer programming;
D O I
10.1016/j.amc.2005.11.112
中图分类号
O29 [应用数学];
学科分类号
070104 ;
摘要
In this paper a bicriteria scheduling problem with sequence-dependent setup times on a single machine is considered. The objective function of the problem is minimization of the weighted sum of total completion time and total tardiness. An integer programming model is developed for the problem which belongs to NP-hard class. Results of computational tests show that the proposed model is effective in solving problems with up to 12 jobs. For solving problems containing large number of jobs a special heuristic algorithm is proposed. Besides the proposed heuristic algorithm tabu search based heuristic is also used for large jobs problems. To improve the performance of tabu search method the result of the proposed heuristic algorithm is taken as an initial solution of tabu search method. According to computational results both heuristic algorithms are effective in finding problem solutions with up to 1000 jobs. According to the best of our knowledge, no works exists on the minimization of the weighted sum of total completion time and total tardiness with sequence-dependent setup times. (c) 2005 Elsevier Inc. All rights reserved.
引用
收藏
页码:378 / 385
页数:8
相关论文
共 50 条
  • [1] Bicriteria scheduling of a two-machine flowshop with sequence-dependent setup times
    Mansouri, S. Afshin
    Hendizadeh, S. Hamed
    Salmasi, Nasser
    [J]. INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2009, 40 (11-12): : 1216 - 1226
  • [2] Bicriteria scheduling of a two-machine flowshop with sequence-dependent setup times
    S. Afshin Mansouri
    S. Hamed Hendizadeh
    Nasser Salmasi
    [J]. The International Journal of Advanced Manufacturing Technology, 2009, 40 : 1216 - 1226
  • [3] A bicriteria m-machine flowshop scheduling with sequence-dependent setup times
    Eren, Tamer
    [J]. APPLIED MATHEMATICAL MODELLING, 2010, 34 (02) : 284 - 293
  • [4] Comments on "A bicriteria m-machine flowshop scheduling with sequence-dependent setup times"
    Xu, Dehua
    Yin, Yunqiang
    [J]. APPLIED MATHEMATICAL MODELLING, 2011, 35 (07) : 3639 - 3643
  • [5] Permutation flowshops in group scheduling with sequence-dependent setup times
    Naderi, B.
    Salmasi, Nasser
    [J]. EUROPEAN JOURNAL OF INDUSTRIAL ENGINEERING, 2012, 6 (02) : 177 - 198
  • [6] Scheduling flowshops with finite buffers and sequence-dependent setup times
    Norman, Bryan A.
    [J]. Computers and Industrial Engineering, 1999, 36 (01): : 163 - 177
  • [7] A deadlock-free scheduling with sequence-dependent setup times
    Hehua Zhang
    Ming Gu
    Xiaoyu Song
    [J]. The International Journal of Advanced Manufacturing Technology, 2009, 45 : 593 - 602
  • [8] A genetic algorithm for the batch scheduling with sequence-dependent setup times
    Chen, TsiuShuang
    Long, Lei
    Fung, Richard Y. K.
    [J]. INTELLIGENT COMPUTING IN SIGNAL PROCESSING AND PATTERN RECOGNITION, 2006, 345 : 1137 - 1144
  • [9] Flow shop batching and scheduling with sequence-dependent setup times
    Liji Shen
    Jatinder N. D. Gupta
    Udo Buscher
    [J]. Journal of Scheduling, 2014, 17 : 353 - 370
  • [10] Scheduling unrelated parallel machines with sequence-dependent setup times
    Zeidi, Javad Rezaeian
    MohammadHosseini, Samir
    [J]. INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2015, 81 (9-12): : 1487 - 1496