Multiple machine continuous setup lotsizing with sequence-dependent setups

被引:0
|
作者
Bernardo Almada-Lobo
Diego Klabjan
Maria Antónia Carravilla
José F. Oliveira
机构
[1] DEIG—Faculdade de Engenharia da Universidade do Porto,Department of Industrial Engineering and Management Sciences
[2] Northwestern University,Faculdade de Engenharia
[3] da Universidade do Porto,undefined
[4] Instituto de Engenharia de Sistemas e Computadores do Porto Campus da FEUP,undefined
关键词
Continuous setup lotsizing; Sequence-dependent setup; Integer programming; Lagrangian decomposition; Heuristics;
D O I
暂无
中图分类号
学科分类号
摘要
We address the short-term production planning and scheduling problem coming from the glass container industry. A furnace melts the glass that is distributed to a set of parallel molding machines. Both furnace and machine idleness are not allowed. The resulting multi-machine multi-item continuous setup lotsizing problem with a common resource has sequence-dependent setup times and costs. Production losses are penalized in the objective function since we deal with a capital intensive industry. We present two mixed integer programming formulations for this problem, which are reduced to a network flow type problem. The two formulations are improved by adding valid inequalities that lead to good lower bounds. We rely on a Lagrangian decomposition based heuristic for generating good feasible solutions. We report computational experiments for randomly generated instances and for real-life data on the aforementioned problem, as well as on a discrete lotsizing and scheduling version.
引用
收藏
页码:529 / 552
页数:23
相关论文
共 50 条
  • [31] Single machine scheduling problems with sequence-dependent setup times and precedence delays
    Shih-Wei Lin
    Kuo-Ching Ying
    Scientific Reports, 12
  • [32] Robust Parallel Machine Scheduling Problem with Uncertainties and Sequence-Dependent Setup Time
    Hu, Hongtao
    Ng, K. K. H.
    Qin, Yichen
    SCIENTIFIC PROGRAMMING, 2016, 2016
  • [33] Single machine scheduling with sequence-dependent setup times and delayed precedence constraints
    Kuo, Yiyo
    Chen, Sheng-, I
    Yeh, Yen-Hung
    OPERATIONAL RESEARCH, 2020, 20 (02) : 927 - 942
  • [34] Hybrid metaheuristics for unrelated parallel machine scheduling with sequence-dependent setup times
    Chun-Lung Chen
    Chuen-Lung Chen
    The International Journal of Advanced Manufacturing Technology, 2009, 43 : 161 - 169
  • [35] Single machine scheduling problems with sequence-dependent setup times and precedence delays
    Lin, Shih-Wei
    Ying, Kuo-Ching
    SCIENTIFIC REPORTS, 2022, 12 (01)
  • [36] On the single machine scheduling problem with sequence-dependent setup times and periodic maintenance
    Krim, Hanane
    Benmansour, Rachid
    Duvivier, David
    2018 5TH INTERNATIONAL CONFERENCE ON CONTROL, DECISION AND INFORMATION TECHNOLOGIES (CODIT), 2018, : 374 - 378
  • [37] A bicriteria m-machine flowshop scheduling with sequence-dependent setup times
    Eren, Tamer
    APPLIED MATHEMATICAL MODELLING, 2010, 34 (02) : 284 - 293
  • [38] Machine Scheduling with Sequence-dependent Setup Times using a Randomized Search Heuristic
    Montoya-Torres, Jairo R.
    Soto-Ferrari, Milton
    Gonzalez-Solano, Fernando
    Alfonso-Lizarazo, Edgar H.
    CIE: 2009 INTERNATIONAL CONFERENCE ON COMPUTERS AND INDUSTRIAL ENGINEERING, VOLS 1-3, 2009, : 28 - +
  • [39] A single machine scheduling problem with availability constraints and sequence-dependent setup costs
    Angel-Bello, Francisco
    Alvarez, Ada
    Pacheco, Joaquin
    Martinez, Iris
    APPLIED MATHEMATICAL MODELLING, 2011, 35 (04) : 2041 - 2050
  • [40] Hybrid flexible flowshops with sequence-dependent setup times and machine availability constraints
    Jabbarizadeh, F.
    Zandieh, M.
    Talebi, D.
    COMPUTERS & INDUSTRIAL ENGINEERING, 2009, 57 (03) : 949 - 957