共 50 条
- [3] Single machine scheduling with sequence-dependent setup times and delayed precedence constraints Operational Research, 2020, 20 : 927 - 942
- [5] On the single machine scheduling problem with sequence-dependent setup times and periodic maintenance 2018 5TH INTERNATIONAL CONFERENCE ON CONTROL, DECISION AND INFORMATION TECHNOLOGIES (CODIT), 2018, : 374 - 378
- [6] A cutting plane algorithm for solving single machine scheduling problems with uncertain sequence-dependent setup times PROCEEDINGS OF THE 36TH INTERNATIONAL MATADOR CONFERENCE, 2010, : 119 - 122
- [10] CONSTRAINT BASED SCHEDULING IN A GENETIC ALGORITHM FOR THE SINGLE MACHINE SCHEDULING PROBLEM WITH SEQUENCE-DEPENDENT SETUP TIMES ICEC 2010: PROCEEDINGS OF THE INTERNATIONAL CONFERENCE ON EVOLUTIONARY COMPUTATION, 2010, : 137 - 145