Models to Analyze Risk in Time and Cost Estimation of Tunneling Projects

被引:0
|
作者
Mohammad Mohammadi
Johan Spross
Håkan Stille
机构
[1] KTH Royal Institute of Technology,Division of Soil and Rock Mechanics
关键词
Time and cost estimation; Tunneling projects; Probabilistic approaches; Risk model; Uncertainty;
D O I
暂无
中图分类号
学科分类号
摘要
Time and cost estimation of tunneling projects is usually performed in a deterministic manner. However, because the deterministic approach is not capable of dealing with uncertainty, probabilistic methods have been developed over the years to better account for this problem. Three models of this type are the Decision Aids for Tunneling (DAT) and two models developed at KTH Royal Institute of Technology and the Czech Technical University in Prague. To conduct a probabilistic time and cost estimation, it is important to understand and account for not only the uncertain factors that affect the project time and cost but also the involved parties’ different interests and contractual responsibilities. This paper develops a risk model for the specific purpose of time and cost estimation of tunneling projects. In light of this model, the practical application of the three probabilistic models is discussed from a risk-aware decision-maker’s perspective. The acquired insights can be helpful in increasing the experts’ risk-awareness in modeling time and cost of tunneling projects.
引用
收藏
页码:1445 / 1457
页数:12
相关论文
共 50 条
  • [1] Models to Analyze Risk in Time and Cost Estimation of Tunneling Projects
    Mohammadi, Mohammad
    Spross, Johan
    Stille, Hakan
    [J]. GEOTECHNICAL AND GEOLOGICAL ENGINEERING, 2024, 42 (02) : 1445 - 1457
  • [2] Model for Estimation of Time and Cost for Tunnel Projects Based on Risk Evaluation
    T. Isaksson
    H. Stille
    [J]. Rock Mechanics and Rock Engineering, 2005, 38 : 373 - 398
  • [3] Model for estimation of time and cost for tunnel projects based on risk evaluation
    Isaksson, T
    Stille, H
    [J]. ROCK MECHANICS AND ROCK ENGINEERING, 2005, 38 (05) : 373 - 398
  • [4] Dynamic reduction of time and cost uncertainties in tunneling projects
    Mahmoodzadeh, Arsalan
    Mohammadi, Mokhtar
    Abdulhamid, Sazan Nariman
    Ibrahim, Hawkar Hashim
    Ali, Hunar Farid Hama
    Salim, Sirwan Ghafoor
    [J]. TUNNELLING AND UNDERGROUND SPACE TECHNOLOGY, 2021, 109
  • [5] Risk-Informed Time-Cost Relationship Models for Sanitation Projects
    Sousa, Vitor
    Almeida, Nuno Marques
    Dias, Luis Alves
    Branco, Fernando Antonio
    [J]. JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2014, 140 (05)
  • [6] Probabilistic Time Estimation of Tunneling Projects: The Uri Headrace Tunnel
    Mohammadi, Mohammad
    Spross, Johan
    Stille, Hakan
    [J]. ROCK MECHANICS AND ROCK ENGINEERING, 2023, 56 (01) : 703 - 717
  • [7] Probabilistic Time Estimation of Tunneling Projects: The Uri Headrace Tunnel
    Mohammad Mohammadi
    Johan Spross
    Håkan Stille
    [J]. Rock Mechanics and Rock Engineering, 2023, 56 : 703 - 717
  • [8] Risk evaluation of tunneling projects
    Fouladgar, M. M.
    Yazdani-Chamzini, A.
    Zavadskas, E. K.
    [J]. ARCHIVES OF CIVIL AND MECHANICAL ENGINEERING, 2012, 12 (01) : 1 - 12
  • [9] Risk evaluation of tunneling projects
    M. M. Fouladgar
    A. Yazdani-Chamzini
    E. K. Zavadskas
    [J]. Archives of Civil and Mechanical Engineering, 2012, 12 : 1 - 12
  • [10] Risk and its impacts on time and cost in construction projects
    Aarthipriya, V.
    Chitra, G.
    Poomozhi, J. Sevvel
    [J]. JOURNAL OF PROJECT MANAGEMENT, 2020, 5 (04) : 245 - 254