Models to Analyze Risk in Time and Cost Estimation of Tunneling Projects

被引:0
|
作者
Mohammad Mohammadi
Johan Spross
Håkan Stille
机构
[1] KTH Royal Institute of Technology,Division of Soil and Rock Mechanics
关键词
Time and cost estimation; Tunneling projects; Probabilistic approaches; Risk model; Uncertainty;
D O I
暂无
中图分类号
学科分类号
摘要
Time and cost estimation of tunneling projects is usually performed in a deterministic manner. However, because the deterministic approach is not capable of dealing with uncertainty, probabilistic methods have been developed over the years to better account for this problem. Three models of this type are the Decision Aids for Tunneling (DAT) and two models developed at KTH Royal Institute of Technology and the Czech Technical University in Prague. To conduct a probabilistic time and cost estimation, it is important to understand and account for not only the uncertain factors that affect the project time and cost but also the involved parties’ different interests and contractual responsibilities. This paper develops a risk model for the specific purpose of time and cost estimation of tunneling projects. In light of this model, the practical application of the three probabilistic models is discussed from a risk-aware decision-maker’s perspective. The acquired insights can be helpful in increasing the experts’ risk-awareness in modeling time and cost of tunneling projects.
引用
收藏
页码:1445 / 1457
页数:12
相关论文
共 50 条
  • [31] EVALUATION OF RESEARCH PROJECTS - MARKETING COST ESTIMATION
    OHSOL, EO
    [J]. CHEMICAL ENGINEERING PROGRESS, 1971, 67 (04) : 19 - &
  • [32] Comparison of estimation methods of cost and duration in IT projects
    Berlin, Stanislav
    Raz, Tzvi
    Glezer, Chanan
    Zviran, Moshe
    [J]. INFORMATION AND SOFTWARE TECHNOLOGY, 2009, 51 (04) : 738 - 748
  • [33] COST ESTIMATION OF RESEARCH AND DEVELOPMENT-PROJECTS
    HINTON, T
    MORAN, DD
    [J]. MECHANICAL ENGINEERING, 1984, 106 (02) : 86 - 86
  • [34] Early cost estimation models based on multiple regression analysis for road and railway tunnel projects
    Ahmed C.
    [J]. Arabian Journal of Geosciences, 2021, 14 (11)
  • [35] Modeling Risk-Related Knowledge in Tunneling Projects
    Cardenas, Ibsen Chivata
    Al-Jibouri, Saad S. H.
    Halman, Johannes I. M.
    van Tol, Frits A.
    [J]. RISK ANALYSIS, 2014, 34 (02) : 323 - 339
  • [36] Quantitative Geotechnical Risk Management for Tunneling Projects in China
    Huang, Hongwei
    Zhang, Dongming
    [J]. GEOTECHNICAL SAFETY AND RISK V, 2015, : 61 - 75
  • [37] Cost Estimation and Risk
    Jenkins, Scott
    [J]. Chemical Engineering (United States), 2020, 127 (09):
  • [38] DOE funds four projects to analyze fuel cell, hydrogen cost variables
    不详
    [J]. AMERICAN CERAMIC SOCIETY BULLETIN, 2011, 90 (08): : 26 - 26
  • [39] Dynamic prediction models of rock quality designation in tunneling projects
    Mahmoodzadeh, Arsalan
    Mohammadi, Mokhtar
    Ali, Hunar Farid Hama
    Abdulhamid, Sazan Nariman
    Ibrahim, Hawkar Hashim
    Noori, Krikar M. Gharrib
    [J]. TRANSPORTATION GEOTECHNICS, 2021, 27
  • [40] Risk Attributes, Influencing the Time and Cost Overrun in Joint Venture Construction Projects of Pakistan
    Akhund, Muhammad Akram
    Khoso, Ali Raza
    Pathan, Ashfaque Ahmed
    Imad, Hafiz Usama
    Siddiqui, Fida
    [J]. ENGINEERING TECHNOLOGY & APPLIED SCIENCE RESEARCH, 2018, 8 (04) : 3260 - 3264