Risk evaluation of tunneling projects

被引:93
|
作者
Fouladgar, M. M. [2 ]
Yazdani-Chamzini, A. [2 ]
Zavadskas, E. K. [1 ]
机构
[1] Vilnius Gediminas Tech Univ, Fac Civil Engn, LT-10223 Vilnius, Lithuania
[2] Dept Strateg Management, Fateh Res Grp, Tehran, Iran
关键词
Tunneling; Risk evaluation; Fuzzy TOPSIS; Ghomroud water conveyance tunnel; MONTE-CARLO-SIMULATION; FUZZY TOPSIS METHOD; GROUP DECISION-MAKING; UNDERGROUND COAL-MINE; EVENT TREE; PERFORMANCE EVALUATION; SIMILARITY MEASURES; MULTIPLE CRITERIA; GHOMROUD TUNNEL; FAILURE MODE;
D O I
10.1016/j.acme.2012.03.008
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Tunneling industry has seen great advancements in underground construction projects. Now, it has significant difference with the last two decades. In many times, tunneling projects find themselves involved in the situation where unexpected conditions threaten the continuation of project. Managers always look for a reliable technique to overcome limitations of finance and time. TOPSIS method is widely used to solve multi criteria decision making (MADM) problems. This technique assigns the best alternative among a pool of feasible alternatives. Furthermore, due to inherent uncertainties in tunneling, using fuzzy logic in order to take into account these uncertainties can be useful. In addition, new factors are introduced to promote the accuracy of risk analysis. Finally, a real world case study is presented to show the effectiveness and the accuracy of the new risk evaluation model. The results demonstrated that collapse is the riskiest parameter in Ghomroud water conveyance tunneling project. (C) 2012 Politechnika Wroclawska. Published by Elsevier Urban & Partner Sp. z.o.o. All rights reserved.
引用
收藏
页码:1 / 12
页数:12
相关论文
共 50 条
  • [1] Risk evaluation of tunneling projects
    M. M. Fouladgar
    A. Yazdani-Chamzini
    E. K. Zavadskas
    [J]. Archives of Civil and Mechanical Engineering, 2012, 12 : 1 - 12
  • [2] Geotechnical Risk Assessments for Tunneling/Underground Projects
    Klein, Steve
    O'Carroll, Joe
    [J]. GEO-RISK 2017: GEOTECHNICAL RISK ASSESSMENT AND MANAGEMENT, 2017, (285): : 291 - 301
  • [3] Modeling Risk-Related Knowledge in Tunneling Projects
    Cardenas, Ibsen Chivata
    Al-Jibouri, Saad S. H.
    Halman, Johannes I. M.
    van Tol, Frits A.
    [J]. RISK ANALYSIS, 2014, 34 (02) : 323 - 339
  • [4] Quantitative Geotechnical Risk Management for Tunneling Projects in China
    Huang, Hongwei
    Zhang, Dongming
    [J]. GEOTECHNICAL SAFETY AND RISK V, 2015, : 61 - 75
  • [5] A method for the evaluation of risk in IT projects
    Rodriguez, Antonio
    Ortega, Francisco
    Concepcion, Ramiro
    [J]. EXPERT SYSTEMS WITH APPLICATIONS, 2016, 45 : 273 - 285
  • [6] RISK EVALUATION OF INVESTMENT PROJECTS
    BONINI, CP
    [J]. OMEGA-INTERNATIONAL JOURNAL OF MANAGEMENT SCIENCE, 1975, 3 (06): : 735 - 750
  • [7] Models to Analyze Risk in Time and Cost Estimation of Tunneling Projects
    Mohammad Mohammadi
    Johan Spross
    Håkan Stille
    [J]. Geotechnical and Geological Engineering, 2024, 42 (2) : 1445 - 1457
  • [8] Models to Analyze Risk in Time and Cost Estimation of Tunneling Projects
    Mohammadi, Mohammad
    Spross, Johan
    Stille, Hakan
    [J]. GEOTECHNICAL AND GEOLOGICAL ENGINEERING, 2024, 42 (02) : 1445 - 1457
  • [9] Research on Risk Evaluation and Risk Optimization of IT Projects
    Yuan Quan
    Long Zi-quan
    [J]. PROCEEDINGS OF THE INTERNATIONAL CONFERENCE ON INFORMATION MANAGEMENT, INNOVATION MANAGEMENT AND INDUSTRIAL ENGINEERING, VOL 1, 2008, : 119 - 123
  • [10] Lifecycle risk management methods for controlling risk factors of underground infrastructure and tunneling projects
    Gyoergy, P.
    Fogarasi, I. S.
    [J]. UNDERGROUND - THE WAY TO THE FUTURE, 2013, : 99 - 103