Risk evaluation of tunneling projects

被引:93
|
作者
Fouladgar, M. M. [2 ]
Yazdani-Chamzini, A. [2 ]
Zavadskas, E. K. [1 ]
机构
[1] Vilnius Gediminas Tech Univ, Fac Civil Engn, LT-10223 Vilnius, Lithuania
[2] Dept Strateg Management, Fateh Res Grp, Tehran, Iran
关键词
Tunneling; Risk evaluation; Fuzzy TOPSIS; Ghomroud water conveyance tunnel; MONTE-CARLO-SIMULATION; FUZZY TOPSIS METHOD; GROUP DECISION-MAKING; UNDERGROUND COAL-MINE; EVENT TREE; PERFORMANCE EVALUATION; SIMILARITY MEASURES; MULTIPLE CRITERIA; GHOMROUD TUNNEL; FAILURE MODE;
D O I
10.1016/j.acme.2012.03.008
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Tunneling industry has seen great advancements in underground construction projects. Now, it has significant difference with the last two decades. In many times, tunneling projects find themselves involved in the situation where unexpected conditions threaten the continuation of project. Managers always look for a reliable technique to overcome limitations of finance and time. TOPSIS method is widely used to solve multi criteria decision making (MADM) problems. This technique assigns the best alternative among a pool of feasible alternatives. Furthermore, due to inherent uncertainties in tunneling, using fuzzy logic in order to take into account these uncertainties can be useful. In addition, new factors are introduced to promote the accuracy of risk analysis. Finally, a real world case study is presented to show the effectiveness and the accuracy of the new risk evaluation model. The results demonstrated that collapse is the riskiest parameter in Ghomroud water conveyance tunneling project. (C) 2012 Politechnika Wroclawska. Published by Elsevier Urban & Partner Sp. z.o.o. All rights reserved.
引用
收藏
页码:1 / 12
页数:12
相关论文
共 50 条
  • [21] Robustness evaluation of cutting tool maintenance planning for soft ground tunneling projects
    Conrads, Alena
    Scheffer, Markus
    Koenig, Markus
    Thewes, Markus
    [J]. UNDERGROUND SPACE, 2018, 3 (01) : 72 - 85
  • [22] A Fuzzy Comprehensive Evaluation Model for Sustainability Risk Evaluation of PPP Projects
    Bai, Libiao
    Li, Yi
    Du, Qiang
    Xu, Yadan
    [J]. SUSTAINABILITY, 2017, 9 (10)
  • [23] An evaluation of risk factors impacting construction projects in Ghana
    Chileshe, Nicholas
    Yirenkyi-Fianko, Adwoa Boadua
    [J]. JOURNAL OF ENGINEERING DESIGN AND TECHNOLOGY, 2012, 10 (03) : 306 - 329
  • [24] Research on Risk Evaluation Method for International Engineering Projects
    HUANG Yi
    LI Sui-ke
    [J]. International Journal of Plant Engineering and Management, 2013, 18 (03) : 140 - 145
  • [25] The applications of risk analysis in the comprehensive evaluation of construction projects
    Ma, Tong Tao
    Li, Cun Bin
    [J]. Proceedings of CRIOCM 2006 International Research Symposium on Advancement of Construction Management and Real Estate, Vols 1 and 2, 2006, : 448 - 453
  • [26] Methodological approach to evaluation of evolutional risk in innovative projects
    Glinenko, L. K.
    [J]. MARKETING AND MANAGEMENT OF INNOVATIONS, 2012, (04): : 161 - 168
  • [27] Risk identification and evaluation for real estate development projects
    Luo, Hongyun
    Lin, Xiangyi
    [J]. PROCEEDINGS OF 2007 INTERNATIONAL CONFERENCE ON CONSTRUCTION & REAL ESTATE MANAGEMENT, VOLS 1 AND 2, 2007, : 723 - 726
  • [28] Research on the evaluation of wind power projects of investment risk
    Jia Xinyao
    Han Yongjun
    Liu Fuchao
    [J]. 8TH INTERNATIONAL CONFERENCE ON ADVANCES IN INFORMATION TECHNOLOGY, 2017, 111 : 388 - 398
  • [29] A deforming time approach to the treatment of risk in projects evaluation
    Cruz-Rambaud, Salvador
    Maria Sanchez-Perez, Ana
    [J]. JOURNAL OF RISK FINANCE, 2018, 19 (05) : 548 - 563
  • [30] Risk Evaluation of the Reengineering Projects: A Case Study Analysis
    Shpak, Nestor
    Sorochak, Oleg
    Hvozd, Maryana
    Sroka, Wlodzimierz
    [J]. SCIENTIFIC ANNALS OF ECONOMICS AND BUSINESS, 2018, 65 (02) : 215 - 226