Model for estimation of time and cost for tunnel projects based on risk evaluation

被引:40
|
作者
Isaksson, T [1 ]
Stille, H [1 ]
机构
[1] Royal Inst Technol, Dept Civil & Architectural Engn, Div Soil & Rock Mech, Stockholm, Sweden
关键词
risk; estimation; cost; time; Monte Carlo simulation; tunnelling;
D O I
10.1007/s00603-005-0048-5
中图分类号
P5 [地质学];
学科分类号
0709 ; 081803 ;
摘要
In the planning and procurement phases of tunnelling projects, numerous decisions have to be made regarding tender price and budget. Many case studies have shown that, in practice, the predicted costs and time schedules are often exceeded. This paper describes a study of the various risk factors in machine tunnelling and their differing impacts on cost and time. It has been concluded from the study that it is important to make a clear distinction between normal cost and time, and the undesirable events that cause exceptional cost and time. Existing decision-aid estimation models consider variation of the risk factors, but do not consider normal cost or time separately from undesirable events. Usually, estimations of project cost and time are made in a deterministic manner, but this does not allow one to consider uncertainty in cost and time variables. However, if the variables are treated probabilistically, the total cost of tunnelling can be expressed as a distribution curve, and a decision can be made on the tunnelling method by comparing the respective cost and time distributions. Based on such decisions, the budget and tender price can be determined separately, both by the client and contractor respectively. To meet the demands placed on decision-making for tender and procurement for currently favoured construction-contracting methods, a new model for estimating tender price and budget has been developed, and is described in this paper. This estimating technique has been applied to a case study of the Grauholz Tunnel. The predictions obtained from the estimation model are shown to be realistic, as the total construction cost and time obtained from the model correspond fairly well to the actual construction cost and time. The separate estimation of normal cost and time and exceptional cost and time contribute to the clarity of the results. The use of the proposed model also shows that the tunnelling method most suitable for the actual geological and hydrogeological conditions can be selected by this method.
引用
收藏
页码:373 / 398
页数:26
相关论文
共 50 条
  • [1] Model for Estimation of Time and Cost for Tunnel Projects Based on Risk Evaluation
    T. Isaksson
    H. Stille
    [J]. Rock Mechanics and Rock Engineering, 2005, 38 : 373 - 398
  • [2] Models to Analyze Risk in Time and Cost Estimation of Tunneling Projects
    Mohammad Mohammadi
    Johan Spross
    Håkan Stille
    [J]. Geotechnical and Geological Engineering, 2024, 42 (2) : 1445 - 1457
  • [3] Models to Analyze Risk in Time and Cost Estimation of Tunneling Projects
    Mohammadi, Mohammad
    Spross, Johan
    Stille, Hakan
    [J]. GEOTECHNICAL AND GEOLOGICAL ENGINEERING, 2024, 42 (02) : 1445 - 1457
  • [4] EVALUATION OF RESEARCH PROJECTS - MARKETING COST ESTIMATION
    OHSOL, EO
    [J]. CHEMICAL ENGINEERING PROGRESS, 1971, 67 (04) : 19 - &
  • [5] PCA based cost estimation model for agile software development projects
    Garg, Sakshi
    Gupta, Daya
    [J]. 2015 INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND OPERATIONS MANAGEMENT (IEOM), 2015,
  • [6] Early cost estimation models based on multiple regression analysis for road and railway tunnel projects
    Ahmed C.
    [J]. Arabian Journal of Geosciences, 2021, 14 (11)
  • [7] Time-cost estimation probabilistic model using MCS in quantitative risk analysis in BOT renewable energy projects
    Yaghubi, D.
    Dorodiyan, M.
    Adibi, M. A.
    [J]. INTERNATIONAL JOURNAL OF INDUSTRIAL ENGINEERING AND MANAGEMENT, 2022, 13 (04): : 250 - 264
  • [8] Probabilistic Time Estimation of Tunneling Projects: The Uri Headrace Tunnel
    Mohammadi, Mohammad
    Spross, Johan
    Stille, Hakan
    [J]. ROCK MECHANICS AND ROCK ENGINEERING, 2023, 56 (01) : 703 - 717
  • [9] Probabilistic Time Estimation of Tunneling Projects: The Uri Headrace Tunnel
    Mohammad Mohammadi
    Johan Spross
    Håkan Stille
    [J]. Rock Mechanics and Rock Engineering, 2023, 56 : 703 - 717
  • [10] ANN-based estimation model for the preconstruction cost of pavement rehabilitation projects
    Shehab, Tariq
    Blampied, Nigel
    Nasr, Elhami
    Sindhu, Laxmi
    [J]. INTERNATIONAL JOURNAL OF CONSTRUCTION MANAGEMENT, 2024, 24 (08) : 894 - 901