Scheduling Risk Evaluation for the Integrated Design of Blanket System Project for CFETR Based on Fuzzy PRET Method

被引:0
|
作者
Ruonan Zhang
Yinfeng Zhu
Shuling Xu
机构
[1] Anhui Jianzhu University,Institute of Plasma Physics
[2] Chinese Academy of Sciences,undefined
来源
Journal of Fusion Energy | 2020年 / 39卷
关键词
Schedule risk; PRET method; Integrated design; Blanket system; CFETR; Magnetic confinement;
D O I
暂无
中图分类号
学科分类号
摘要
In the framework of the conceptual design and engineering design of the Chinese Fusion Engineering Testing Reactor, some preliminary investigation and estimation of the encountered risk factors in the integrated design process of blanket system were carried out. Sub-tasks of the entire project need to be decomposed before performing the integrated design of blanket system in order to perform a risk assessment for each task. To describe the key time of design process and predict the dates of tasks, a fuzzy PERT method is presented. The integrated design of blanket system project is divided into several tasks, which includes the optimistic time, pessimistic time and the most likely time of each task based on the experience of designer and analyst. The earliest start/finish time, latest start/finish time and slack time of each task is calculated by using the fuzzy PERT method. As a result, the critical path is found for scheduling assessment. The completing probability of the project under different requirements during the design period is calculated, which can provide valuable reference for the scheduling assessment of the integrated design of blanket system project.
引用
收藏
页码:156 / 162
页数:6
相关论文
共 50 条
  • [31] Risk assessment system of industrial clusters based on fuzzy synthetic evaluation method
    Zhang Xiaolei
    PROCEEDINGS OF INTERNATIONAL CONFERENCE ON RISK MANAGEMENT AND ENGINEERING MANAGEMENT, 2008, : 86 - 91
  • [32] Safety Risk Evaluation of Aviation System Based on Fuzzy Evidential Reasoning Method
    Gao, Jianguo
    Zhang, Han
    Wang, Qiang
    Min, Guilong
    SIXTH INTERNATIONAL CONFERENCE ON ELECTROMECHANICAL CONTROL TECHNOLOGY AND TRANSPORTATION (ICECTT 2021), 2022, 12081
  • [33] A risk investment evaluation method based on dynamic bayesian network and fuzzy system
    Xie Lechen
    Wang Wenlan
    JOURNAL OF INTELLIGENT & FUZZY SYSTEMS, 2020, 39 (02) : 1515 - 1523
  • [34] Risk Evaluation of Railway Construction Project Based on Fuzzy AHP
    Bai Yunfei
    Ren Xun
    EBM 2010: INTERNATIONAL CONFERENCE ON ENGINEERING AND BUSINESS MANAGEMENT, VOLS 1-8, 2010, : 4297 - 4300
  • [35] Risk Evaluation Research on A-FUZZY-based Management by Project
    Zhong Chang-bao
    Wu Jia-bao
    Wei Xiao-ping
    2008 4TH INTERNATIONAL CONFERENCE ON WIRELESS COMMUNICATIONS, NETWORKING AND MOBILE COMPUTING, VOLS 1-31, 2008, : 10585 - +
  • [36] Project Risk Evaluation Based on Triangle Fuzzy Number and TOPSIS
    Guo, Zixue
    Zhang, Qiang
    ADVANCES IN BUSINESS INTELLIGENCE AND FINANCIAL ENGINEERING, 2008, 5 : 382 - +
  • [37] Dynamic fuzzy evaluation of construction project risk based on collaboration
    Gao, Yun-Li
    Li, Hong-Nan
    Zhang, Guo-Jun
    Dalian Ligong Daxue Xuebao/Journal of Dalian University of Technology, 2010, 50 (03): : 404 - 408
  • [38] A Risk Management Methodology for R&D Project Risk Based on AHP and Fuzzy Comprehensive Evaluation Method
    Jiang, Wenbo
    Chai, Huaqi
    2015 IEEE INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT (IEEM), 2015, : 320 - 324
  • [39] A dynamic critical path method for project scheduling based on a generalised fuzzy similarity
    Liu, Dajiang
    Hu, Changming
    JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, 2021, 72 (02) : 458 - 470
  • [40] Application of fuzzy comprehensive evaluation method in engineering project risk management
    Gao, Lang
    Li, Xin
    CONSTRUCTION AND URBAN PLANNING, PTS 1-4, 2013, 671-674 : 3087 - 3090