共 50 条
- [41] The Application of Fuzzy Comprehensive Evaluation Based on AHP in Risk Evaluation of Engineering Project ADVANCES IN MANAGEMENT OF TECHNOLOGY, PT 2, 2010, : 108 - 112
- [42] Risk Evaluation of Scientific and Technological Innovation Project Management Based on Fuzzy Evaluation 2011 INTERNATIONAL CONFERENCE ON EDUCATION SCIENCE AND MANAGEMENT ENGINEERING (ESME 2011), VOLS 1-5, 2011, : 429 - 432
- [43] Risk Management in Highway Construction Project Based on Integrated Project Management System ADVANCES IN MANAGEMENT OF TECHNOLOGY, PT 1, 2008, : 146 - +
- [44] Synthetic evaluation of integrated energy system based on AHP-fuzzy comprehensive assessment method 2020 INTERNATIONAL CONFERENCE ON ENERGY, ENVIRONMENT AND BIOENGINEERING (ICEEB 2020), 2020, 185
- [47] Risk Assessment of Accounting Information System Based on AHP and Fuzzy Comprehensive Evaluation Method 2011 6TH INTERNATIONAL CONFERENCE ON COMPUTER SCIENCES AND CONVERGENCE INFORMATION TECHNOLOGY (ICCIT), 2012, : 905 - 908
- [48] Risk Evaluation of Highway Engineering Project Based on the Fuzzy-AHP INTERNATIONAL CONFERENCE ON GRAPHIC AND IMAGE PROCESSING (ICGIP 2011), 2011, 8285
- [49] Risk Evaluation on Ship Navigation System Based on Analytic Hierarchy Process and Fuzzy Comprehensive Evaluation Method PROCEEDINGS OF THE 33RD CHINESE CONTROL AND DECISION CONFERENCE (CCDC 2021), 2021, : 3944 - 3948
- [50] Fuzzy Comprehensive Evaluation Method for Risk Assessment in EPC International Engineering Project PROCEEDINGS OF CHINA-CANADA INDUSTRY WORKSHOP ON ENTERPRISE RISK MANAGEMENT 2008, 2008, : 293 - 299