Uncertain project scheduling problem with resource constraints

被引:0
|
作者
Xiaoyu Ji
Kai Yao
机构
[1] Renmin University of China,School of Business
[2] University of Chinese Academy of Sciences,School of Management
来源
关键词
Project scheduling; Uncertain programming; Uncertainty theory; Genetic algorithm;
D O I
暂无
中图分类号
学科分类号
摘要
Project scheduling problem is to make a schedule for allocating the loans to a project such that the total cost and the completion time of the project are balanced under some constraints. This paper presents an uncertain project scheduling problem, of which both the duration times and the resources allocation times are uncertain variables. An uncertain programming model with multiple objectives is obtained, whose first objective is to minimize the total cost, and second objective is to minimize the overtime. Genetic algorithm is employed to solve the proposed uncertain project scheduling model, and its efficiency is illustrated by a numerical experiment.
引用
收藏
页码:575 / 580
页数:5
相关论文
共 50 条
  • [31] Multi-project scheduling problem under shared multi-skill resource constraints
    Meya Haroune
    Cheikh Dhib
    Emmanuel Neron
    Ameur Soukhal
    Hafed Mohamed Babou
    Mohamedade Farouk Nanne
    TOP, 2023, 31 : 194 - 235
  • [32] An evolutionary approach for resource constrained project scheduling with uncertain changes
    Zaman, Forhad
    Elsayed, Saber
    Sarker, Ruhul
    Essam, Daryl
    Coello Coello, Carlos A.
    COMPUTERS & OPERATIONS RESEARCH, 2021, 125
  • [33] Robust optimization for the resource-constrained multi-project scheduling problem with uncertain activity durations
    Nabipoor Afruzi E.
    Aghaie A.
    Najafi A.A.
    Scientia Iranica, 2020, 27 (1 E) : 361 - 376
  • [34] An adjustable robust optimization model for the resource-constrained project scheduling problem with uncertain activity durations
    Bruni, M. E.
    Pugliese, L. Di Puglia
    Beraldi, P.
    Guerriero, F.
    OMEGA-INTERNATIONAL JOURNAL OF MANAGEMENT SCIENCE, 2017, 71 : 66 - 84
  • [35] Robust optimization for the resource-constrained multi-project scheduling problem with uncertain activity durations
    Afruzi, E. Nabipoor
    Aghaie, A.
    Najafi, A. A.
    SCIENTIA IRANICA, 2020, 27 (01) : 361 - 376
  • [36] A Hybrid Method for the Resource-Constrained Project Scheduling Problem with Hammock Activities and Strip Packing like Resource Constraints
    Eliezer, O.
    Levi, R.
    PROCEEDINGS OF THE SEVENTH INTERNATIONAL CONFERENCE ON ENGINEERING COMPUTATIONAL TECHNOLOGY, 2010, 94
  • [37] Multidirectional Scheduling Scheme in Resource-Constrained Project Scheduling Problem
    Yoosefzadeh, Hamid R.
    Tareghian, Hamed R.
    Farahi, Mohammad H.
    NAVAL RESEARCH LOGISTICS, 2014, 61 (01) : 44 - 55
  • [38] Models and solution procedures for the resource-constrained project scheduling problem with general temporal constraints and calendars
    Kreter, Stefan
    Rieck, Julia
    Zimmermann, Juergen
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2016, 251 (02) : 387 - 403
  • [39] PROJECT SCHEDULING WITH RESOURCE CONSTRAINTS USING BRANCH AND BOUND METHODS
    WILLIS, RJ
    HASTINGS, NAJ
    OPERATIONAL RESEARCH QUARTERLY, 1976, 27 (02) : 341 - 349
  • [40] Multi-project scheduling in a construction environment with resource constraints
    Stephenson, P
    Ying, Y
    SYSTEM-BASED VISION FOR STRATEGIC AND CREATIVE DESIGN, VOLS 1-3, 2003, : 2251 - 2255