Uncertain project scheduling problem with resource constraints

被引:0
|
作者
Xiaoyu Ji
Kai Yao
机构
[1] Renmin University of China,School of Business
[2] University of Chinese Academy of Sciences,School of Management
来源
关键词
Project scheduling; Uncertain programming; Uncertainty theory; Genetic algorithm;
D O I
暂无
中图分类号
学科分类号
摘要
Project scheduling problem is to make a schedule for allocating the loans to a project such that the total cost and the completion time of the project are balanced under some constraints. This paper presents an uncertain project scheduling problem, of which both the duration times and the resources allocation times are uncertain variables. An uncertain programming model with multiple objectives is obtained, whose first objective is to minimize the total cost, and second objective is to minimize the overtime. Genetic algorithm is employed to solve the proposed uncertain project scheduling model, and its efficiency is illustrated by a numerical experiment.
引用
收藏
页码:575 / 580
页数:5
相关论文
共 50 条
  • [41] GENRES - EXTENSION OF BROOKS ALGORITHM FOR PROJECT SCHEDULING WITH RESOURCE CONSTRAINTS
    WHITEHOUSE, GE
    BROWN, JR
    COMPUTERS & INDUSTRIAL ENGINEERING, 1979, 3 (03) : 261 - 268
  • [42] ALGORITHM FOR OPTIMAL PROJECT SCHEDULING UNDER MULTIPLE RESOURCE CONSTRAINTS
    DAVIS, EW
    HEIDORN, GE
    MANAGEMENT SCIENCE SERIES B-APPLICATION, 1971, 17 (12): : B803 - B816
  • [43] Particle Swarm Optimization for Preemptive Project Scheduling with Resource Constraints
    Li, Fei
    Lai, Changtao
    Shou, Yongyi
    2011 IEEE INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT (IEEM), 2011, : 869 - 873
  • [44] A note on "project scheduling with resource constraints: A branch and bound approach"
    Kaefer, F
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2000, 125 (01) : 216 - 217
  • [45] Genetic algorithm for resource leveling problem in project scheduling
    Liu, S.X.
    Wang, M.G.
    2001, Systems Engineering Society of China (21):
  • [46] Genetic Algorithms for the Resource Constrained Project Scheduling Problem
    Gargiulo, F.
    Quagliarella, D.
    13TH IEEE INTERNATIONAL SYMPOSIUM ON COMPUTATIONAL INTELLIGENCE AND INFORMATICS (CINTI 2012), 2012, : 39 - 47
  • [47] A preemptive bound for the Resource Constrained Project Scheduling Problem
    Mohamed Haouari
    Anis Kooli
    Emmanuel Néron
    Jacques Carlier
    Journal of Scheduling, 2014, 17 : 237 - 248
  • [48] Resource-constrained project scheduling problem with reworking
    Liao Y.
    Lu Z.
    Jisuanji Jicheng Zhizao Xitong/Computer Integrated Manufacturing Systems, CIMS, 2019, 25 (11): : 2762 - 2774
  • [49] A matheuristic for the resource-constrained project scheduling problem
    Vanhoucke, Mario
    Coelho, Jose
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2024, 319 (03) : 711 - 725
  • [50] Proactive and reactive strategies for resource-constrained project scheduling with uncertain resource availabilities
    Lambrechts, Olivier
    Demeulemeester, Erik
    Herroelen, Willy
    JOURNAL OF SCHEDULING, 2008, 11 (02) : 121 - 136