A hybrid conceptual cost estimating model using ANN and GA for power plant projects

被引:0
|
作者
Sanaz Tayefeh Hashemi
Omid Mahdi Ebadati E.
Harleen Kaur
机构
[1] Planning and Coordination Deputy of Power Division,Department of Information Technology Management
[2] MAPNA Group Co,Department of Mathematics and Computer Science
[3] Kharazmi University,Department of Computer Science and Engineering, School of Engineering Sciences and Technology
[4] Kharazmi University,undefined
[5] Hamdard University,undefined
来源
关键词
MAPNA Group Co.; Artificial neural network (ANN); Genetic algorithm (GA); Construction cost; Early-stage cost estimation;
D O I
暂无
中图分类号
学科分类号
摘要
Providing an accurate completion cost estimate helps managers in deciding whether to undertake the project due to cash in hand. Hence, MAPNA Group Co. as an Iranian leading general contractor of power plant projects is not an exception too. Cost prediction in these projects is of great importance, whereas it can assist managers to keep their overall budget under control. Literature has been reviewed and influencing variables are explored. Thereafter, an artificial neural network model is developed and combined with genetic algorithm to select the best network architecture. According to the literature reviewed, almost all of the performed studies have selected the optimum network architecture through a process of trial and error, which makes the present method worthy of implementation. The best network architecture is capable of predicting projects’ cost of accuracy equal to 94.71%. A sensitivity analysis is then performed to test the significance degree of model input variables.
引用
收藏
页码:2143 / 2154
页数:11
相关论文
共 50 条
  • [1] A hybrid conceptual cost estimating model using ANN and GA for power plant projects
    Hashemi, Sanaz Tayefeh
    Ebadati, Omid Mandi E.
    Kaur, Harleen
    [J]. NEURAL COMPUTING & APPLICATIONS, 2019, 31 (07): : 2143 - 2154
  • [2] A hybrid conceptual cost estimating model for large building projects
    Kim, Hyung-Jin
    Seo, Yong-Chil
    Hyun, Chang-Taek
    [J]. AUTOMATION IN CONSTRUCTION, 2012, 25 : 72 - 81
  • [3] A methodology for estimating the product life cycle cost using a hybrid GA and ANN model
    Seo, Kwang-Kyu
    [J]. ARTIFICIAL NEURAL NETWORKS - ICANN 2006, PT 1, 2006, 4131 : 386 - 395
  • [4] Conceptual cost estimating model for water pipeline projects
    Alkhalil, M
    Assaf, S
    Rahman, WA
    Asfoor, M
    [J]. ARABIAN JOURNAL FOR SCIENCE AND ENGINEERING, 1998, 23 (1C): : 89 - 100
  • [5] Cost prediction of building projects using the novel hybrid RA-ANN model
    Wang, Yali
    Zuo, Jian
    Pan, Min
    Tu, Bocun
    Chang, Rui-Dong
    Liu, Shicheng
    Xiong, Feng
    Dong, Na
    [J]. ENGINEERING CONSTRUCTION AND ARCHITECTURAL MANAGEMENT, 2023, 31 (06) : 2563 - 2582
  • [6] RETRACTION: Cost prediction of building projects using the novel hybrid RA-ANN model
    Wang, Y.
    Zuo, J.
    Pan, M.
    Tu, B.
    Chang, R. D.
    Liu, S.
    Xiong, F.
    Dong, N.
    [J]. ENGINEERING CONSTRUCTION AND ARCHITECTURAL MANAGEMENT, 2024,
  • [7] Schedule and Cost Forecasting Model for Nuclear Power Plant Projects
    Karatas, Aslihan
    Al-Sharif, Samer
    [J]. CONSTRUCTION RESEARCH CONGRESS 2020: PROJECT MANAGEMENT AND CONTROLS, MATERIALS, AND CONTRACTS, 2020, : 721 - 729
  • [8] Stochastic Conceptual Cost Estimating of Highway Projects to Communicate Uncertainty Using Bootstrap Sampling
    Gardner, Brendon J.
    Gransberg, Douglas D.
    Rueda, Jorge A.
    [J]. ASCE-ASME JOURNAL OF RISK AND UNCERTAINTY IN ENGINEERING SYSTEMS PART A-CIVIL ENGINEERING, 2017, 3 (03):
  • [9] Cost-inclusive heuristic power management of hybrid power generation plant with ANN-regulated biogas plant
    Anand, Kundan
    Mittal, Alok Prakash
    Kumar, Bhavnesh
    [J]. SUSTAINABLE CITIES AND SOCIETY, 2023, 97
  • [10] A GA-BP Hybrid Algorithm Based ANN Model for Wind Power Prediction
    Kassa, Yordanos
    Zhang, J. H.
    Zheng, D. H.
    Wei, Dan
    [J]. 2016 THE 4TH IEEE INTERNATIONAL CONFERENCE ON SMART ENERGY GRID ENGINEERING (SEGE), 2016, : 158 - 163