共 50 条
- [2] A hybrid conceptual cost estimating model using ANN and GA for power plant projects [J]. NEURAL COMPUTING & APPLICATIONS, 2019, 31 (07): : 2143 - 2154
- [3] A hybrid conceptual cost estimating model using ANN and GA for power plant projects [J]. Neural Computing and Applications, 2019, 31 : 2143 - 2154
- [5] Stochastic Conceptual Cost Estimating of Highway Projects to Communicate Uncertainty Using Bootstrap Sampling [J]. ASCE-ASME JOURNAL OF RISK AND UNCERTAINTY IN ENGINEERING SYSTEMS PART A-CIVIL ENGINEERING, 2017, 3 (03):
- [8] Lifecycle cost optimization of pipeline projects [J]. JOURNAL OF WATER SUPPLY RESEARCH AND TECHNOLOGY-AQUA, 2020, 69 (07): : 656 - 667
- [9] Conceptual model for estimating water recovery in tailings impoundments [J]. TAILINGS AND MINE WASTE '03, 2003, : 87 - 94