摘要
Conceptual cost estimating is a challenging task under time and information constraints. This paper presents a practical hybrid conceptual cost estimating model for large building projects, including multiple mixed-use buildings. In this model, two different methods, assembly-based estimating and historical data-based estimating, can be used either together or separately at the work package level whereas a mixed-use building is considered a unique combination of multiple spaces for different uses. Comparing the two estimates reduces the uncertainty associated with using the limited project information in the early phase. The practical use of automated conceptual estimation has been achieved through a comprehensive and realistic approach that accounts for the estimator's role in the automated process, user acceptance of and confidence in the final estimate, and the efficient use of incomplete historical data. A case study using eight large building projects found that the proposed hybrid model can improve the accuracy of and estimators' confidence in the conceptual estimates. (C) 2012 Elsevier B.V. All rights reserved.
引用
收藏
页码:72 / 81
页数:10
相关论文
共 50 条
  • [1] Conceptual cost estimating model for water pipeline projects
    Alkhalil, M
    Assaf, S
    Rahman, WA
    Asfoor, M
    [J]. ARABIAN JOURNAL FOR SCIENCE AND ENGINEERING, 1998, 23 (1C): : 89 - 100
  • [2] A hybrid conceptual cost estimating model using ANN and GA for power plant projects
    Hashemi, Sanaz Tayefeh
    Ebadati, Omid Mandi E.
    Kaur, Harleen
    [J]. NEURAL COMPUTING & APPLICATIONS, 2019, 31 (07): : 2143 - 2154
  • [3] A hybrid conceptual cost estimating model using ANN and GA for power plant projects
    Sanaz Tayefeh Hashemi
    Omid Mahdi Ebadati E.
    Harleen Kaur
    [J]. Neural Computing and Applications, 2019, 31 : 2143 - 2154
  • [4] A Final Cost Estimating Model for Building Renovation Projects
    Papadimitriou, Vasso E.
    Aretoulis, Georgios N.
    [J]. BUILDINGS, 2024, 14 (04)
  • [5] A conceptual framework for hybrid building projects
    Adeyeye, Kemi
    Bouchlaghem, Dino
    Pasquire, Christine
    [J]. FACILITIES, 2010, 28 (7-8) : 358 - 370
  • [6] Reliabilty assessment of conceptual cost estimates for building construction projects
    An, Sung-Hoon
    Cho, Hunhee
    Lee, Ung-Kyun
    [J]. INTERNATIONAL JOURNAL OF CIVIL ENGINEERING, 2011, 9 (01) : 9 - 16
  • [7] Machine learning regression for estimating the cost range of building projects
    Gurmu, Argaw
    Miri, Mani Pourdadash
    [J]. CONSTRUCTION INNOVATION-ENGLAND, 2023,
  • [8] SIMULATION PROJECTS - BUILDING THE RIGHT CONCEPTUAL-MODEL
    ROBINSON, S
    [J]. INDUSTRIAL ENGINEERING, 1994, 26 (09): : 34 - 36
  • [9] Cost prediction of building projects using the novel hybrid RA-ANN model
    Wang, Yali
    Zuo, Jian
    Pan, Min
    Tu, Bocun
    Chang, Rui-Dong
    Liu, Shicheng
    Xiong, Feng
    Dong, Na
    [J]. ENGINEERING CONSTRUCTION AND ARCHITECTURAL MANAGEMENT, 2023, 31 (06) : 2563 - 2582
  • [10] Conceptual cost estimation of building projects with regression analysis and neural networks
    Sonmez, R
    [J]. CANADIAN JOURNAL OF CIVIL ENGINEERING, 2004, 31 (04) : 677 - 683