A hybrid conceptual cost estimating model using ANN and GA for power plant projects

被引:0
|
作者
Sanaz Tayefeh Hashemi
Omid Mahdi Ebadati E.
Harleen Kaur
机构
[1] Planning and Coordination Deputy of Power Division,Department of Information Technology Management
[2] MAPNA Group Co,Department of Mathematics and Computer Science
[3] Kharazmi University,Department of Computer Science and Engineering, School of Engineering Sciences and Technology
[4] Kharazmi University,undefined
[5] Hamdard University,undefined
来源
Neural Computing and Applications | 2019年 / 31卷
关键词
MAPNA Group Co.; Artificial neural network (ANN); Genetic algorithm (GA); Construction cost; Early-stage cost estimation;
D O I
暂无
中图分类号
学科分类号
摘要
Providing an accurate completion cost estimate helps managers in deciding whether to undertake the project due to cash in hand. Hence, MAPNA Group Co. as an Iranian leading general contractor of power plant projects is not an exception too. Cost prediction in these projects is of great importance, whereas it can assist managers to keep their overall budget under control. Literature has been reviewed and influencing variables are explored. Thereafter, an artificial neural network model is developed and combined with genetic algorithm to select the best network architecture. According to the literature reviewed, almost all of the performed studies have selected the optimum network architecture through a process of trial and error, which makes the present method worthy of implementation. The best network architecture is capable of predicting projects’ cost of accuracy equal to 94.71%. A sensitivity analysis is then performed to test the significance degree of model input variables.
引用
收藏
页码:2143 / 2154
页数:11
相关论文
共 50 条
  • [41] A cost-estimating method of civil engineering by using fuzzy mathematics and ANN
    Wang, JP
    Li, QF
    Wang, XJ
    ICIM' 2004: PROCEEDINGS OF THE SEVENTH INTERNATIONAL CONFERENCE ON INDUSTRIAL MANAGEMENT, 2004, : 599 - 604
  • [42] Structuring risks for a comprehensive understanding of cost overruns in power plant projects
    Islam, Muhammad Saiful
    Nepal, Madhav
    Skitmore, Martin
    CONSTRUCTION INNOVATION-ENGLAND, 2023,
  • [43] Estimating winter streamflow using conceptual streamflow model
    Hamilton, AS
    Hutchinson, DG
    Moore, RD
    JOURNAL OF COLD REGIONS ENGINEERING, 2000, 14 (04) : 158 - 175
  • [44] Application of ANN control algorithm for optimizing performance of a hybrid ORC power plant
    Podlasek, Szymon
    Jankowski, Marcin
    Balazy, Patryk
    Lalik, Krzysztof
    Figaj, Rafal
    ENERGY, 2024, 306
  • [45] Estimating the cost of capital for solar PV projects using auction results
    Egli, Florian
    Orgland, Nikolai
    Taylor, Michael
    Schmidt, Tobias S.
    Steffen, Bjarne
    ENERGY POLICY, 2023, 183
  • [46] Development of a Model for Risk and Cost Analysis in Overseas Plant Construction Projects Focusing on Petrochemical Plant Construction Projects
    Kim, Yong-Su
    Kang, Hyun-Wook
    KSCE JOURNAL OF CIVIL ENGINEERING, 2017, 21 (05) : 1549 - 1562
  • [47] Development of a model for risk and cost analysis in overseas plant construction projects focusing on petrochemical plant construction projects
    Yong-Su Kim
    Hyun-Wook Kang
    KSCE Journal of Civil Engineering, 2017, 21 : 1549 - 1562
  • [48] Power Quality Improvement Using ANN Controller For Hybrid Power Distribution Systems
    Quawi, Abdul
    Shuaib, Y. Mohamed
    Manikandan, M.
    INTELLIGENT AUTOMATION AND SOFT COMPUTING, 2023, 36 (03): : 3469 - 3486
  • [49] A conceptual cost estimation model for the pre-design stage of road projects using multiple regression analysis
    Atapattu, Chinthaka Niroshan
    Domingo, Niluka
    Sutrisna, Monty
    JOURNAL OF FINANCIAL MANAGEMENT OF PROPERTY AND CONSTRUCTION, 2024, 29 (03) : 388 - 404
  • [50] Web-based conceptual cost estimates for construction projects using Evolutionary Fuzzy Neural Inference Model
    Cheng, Min-Yuan
    Tsai, Hsing-Chih
    Hsieh, Wen-Shan
    AUTOMATION IN CONSTRUCTION, 2009, 18 (02) : 164 - 172