Implementing earned value management using bridge information modeling

被引:0
|
作者
Mohamed Marzouk
Mohamed Hisham
机构
[1] Cairo University,Structural Engineering Department
[2] Nile University,Construction Engineering and Management Program
来源
关键词
building information modeling; infrastructure bridges; bridge information modeling; cost estimate; time and cost control;
D O I
暂无
中图分类号
学科分类号
摘要
Building Information Modeling (BIM) has widely become an effective tool in engineering and construction fields. It could be used in: generating shop drawings; detecting clashes; estimating quantities; and controlling documents. Applying BIM technology on bridges is named Bridge Information Modeling (BrIM). Bridge Information Modeling (BrIM) is an intelligent representation of bridges since it contains all information needed about bridges through their whole lifecycle. This paper presents the use of Building Information Modeling in cost and time management of infrastructure bridges. BIM-based cost estimation application is presented which is capable to carry out approximate cost estimate; and detailed cost estimate. The application is designed in a flexible manner to be used with default values, or user defined values. Different performance measurement indexes are used in order to control the cost and schedule during execution phase of construction projects. This application integrates BIM with Earned Value (EV) concept to determine the project status at specific reporting date. A case study is presented to demonstrate the use of the developed modules.
引用
收藏
页码:1302 / 1313
页数:11
相关论文
共 50 条
  • [41] Proposing a novel combination of Earned Value Management and Requirements Management
    Jarlsberg, Kristian Frederik Wedel
    Andersson, Jonas
    INCOSE International Symposium, 2023, 33 (01) : 1384 - 1402
  • [42] Earned value management at NASA: An integrated, lightweight solution
    Putz, Peter
    Maluf, David A.
    Bell, David G.
    Gurram, Mohana M.
    Hsu, Jennifer
    Patel, Hemil N.
    Swanson, Keith J.
    2007 IEEE AEROSPACE CONFERENCE, VOLS 1-9, 2007, : 4655 - +
  • [43] Earned value project management: Improving the predictive power of planned value
    Chen, Hong Long
    Chen, Wei Tong
    Lin, Ying Lien
    INTERNATIONAL JOURNAL OF PROJECT MANAGEMENT, 2016, 34 (01) : 22 - 29
  • [44] A Systematic Review Based on Earned Value Management and Quality
    Lima Francisco, Christopher de Souza
    de Souza, Adler Diniz
    16TH INTERNATIONAL CONFERENCE ON INFORMATION TECHNOLOGY-NEW GENERATIONS (ITNG 2019), 2019, 800 : 135 - 141
  • [45] Combination of Project Cost Forecasts in Earned Value Management
    Kim, Byung-Cheol
    Reinschmidt, Kenneth F.
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 2011, 137 (11): : 958 - 966
  • [46] Earned Value Management System in Indonesian Construction Projects
    Priyo, Mandiyo
    INTERNATIONAL JOURNAL OF INTEGRATED ENGINEERING, 2021, 13 (03): : 37 - 45
  • [47] Use of Earned Value Management in the UAE Construction Industry
    Morad, Mohamed
    El-Sayegh, Sameh M.
    2016 INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING, MANAGEMENT SCIENCE AND APPLICATIONS (ICIMSA), 2016,
  • [48] A multivariate approach for top-down project control using earned value management
    Colin, Jeroen
    Martens, Annelies
    Vanhoucke, Mario
    Wauters, Mathieu
    DECISION SUPPORT SYSTEMS, 2015, 79 : 65 - 76
  • [49] Using Earned Value Management and Schedule Risk Analysis with resource constraints for project control
    Song, Jie
    Martens, Annelies
    Vanhoucke, Mario
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2022, 297 (02) : 451 - 466
  • [50] Fuzzy extended earned value management: A novel perspective
    Salari, Mostafa
    Bagherpour, Morteza
    Kamyabniya, Afshin
    JOURNAL OF INTELLIGENT & FUZZY SYSTEMS, 2014, 27 (03) : 1393 - 1406