A quay crane productivity predictive model for building accurate quay crane schedules

被引:5
|
作者
Chargui, Kaoutar [1 ]
Zouadi, Tarik [2 ]
El Fallahi, Abdellah [1 ]
Reghioui, Mohamed [1 ]
Aouam, Tarik [2 ,3 ]
机构
[1] Univ Abdelmalek Essaadi, Natl Sch Appl Sci Tetouan, MOSIL Res Team, Tetouan, Morocco
[2] Int Univ Rabat, Rabat Business Sch, BEAR Lab, Sale, Morocco
[3] Univ Ghent, Fac Econ & Business Adm, Ghent, Belgium
来源
SUPPLY CHAIN FORUM | 2021年 / 22卷 / 02期
关键词
Quay crane productivity; neural networks; quay crane scheduling;
D O I
10.1080/16258312.2020.1831889
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
The efficient management of maritime logistics operations improves the performance of global supply chains. An important issue in container terminal operations is the scheduling of quay cranes (QCs), which is affected by the productivity rate of QCs. This productivity rate depends on the type of tasks to be completed by QCs on any given vessel. In this paper, we propose an artificial neural network (ANN) model with a variable neighbourhood search (VNS) as a training algorithm to build a productivity rate predictive model. This model considers several predictors depending on the type of containers in the vessel and the expected equipment downtime. We also study how QC scheduling is impacted by the productivity rate of QCs. The proposed predictive model and a moving average model are used to estimate the productivity rate, which is then taken as input to the QC scheduling optimisation model. Results show that when the proposed predictive model is used, QC schedules are closer to those generated using real data obtained from our container terminal partner.
引用
收藏
页码:136 / 156
页数:21
相关论文
共 50 条
  • [41] A note on a model for quay crane scheduling with non-crossing constraints
    Santini, Alberto
    Friberg, Henrik Alsing
    Ropke, Stefan
    ENGINEERING OPTIMIZATION, 2015, 47 (06) : 860 - 865
  • [42] An Online Model of Berth and Quay Crane Integrated Allocation in Container Terminals
    Zheng, Feifeng
    Qiao, Longliang
    Liu, Ming
    COMBINATORIAL OPTIMIZATION AND APPLICATIONS, (COCOA 2015), 2015, 9486 : 721 - 730
  • [43] Multi-objective optimization of container terminal scheduling considering shared operation of adjacent quay crane under quay crane failure
    Wu N.
    Wu D.
    Wang N.
    Jisuanji Jicheng Zhizao Xitong/Computer Integrated Manufacturing Systems, CIMS, 2023, 29 (01): : 331 - 339
  • [44] Disruption recovery model for berth and quay crane scheduling in container terminals
    Zeng, Qingcheng
    Yang, Zhongzhen
    Hu, Xiangpei
    ENGINEERING OPTIMIZATION, 2011, 43 (09) : 967 - 983
  • [45] An enriched model for the integrated berth allocation and quay crane assignment problem
    Raa, Birger
    Dullaert, Wout
    Van Schaeren, Rowan
    EXPERT SYSTEMS WITH APPLICATIONS, 2011, 38 (11) : 14136 - 14147
  • [46] Research on mathematical model of quay container crane simulation training system
    Liang, Chengji
    Huang, Youfang
    Wang, Chonghua
    PROCEEDING OF THE SEVENTH INTERNATIONAL CONFERENCE ON INFORMATION AND MANAGEMENT SCIENCES, 2008, 7 : 206 - 211
  • [47] Optimizing Multi-Quay Combined Berth and Quay Crane Allocation Using Computational Intelligence
    Aslam, Sheraz
    Michaelides, Michalis P.
    Herodotou, Herodotos
    JOURNAL OF MARINE SCIENCE AND ENGINEERING, 2024, 12 (09)
  • [48] A local branching-based algorithm for the quay crane scheduling problem under unidirectional schedules
    Pasquale Legato
    Roberto Trunfio
    4OR, 2014, 12 : 123 - 156
  • [49] Exact Algorithms for Robust Quay Crane Scheduling Problems
    Li, Yitian
    Zhang, Canrong
    2021 IEEE INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT (IEEE IEEM21), 2021, : 1631 - 1635
  • [50] Simulated Annealing Algorithm for the Quay Crane Scheduling Problem
    Liu, Yan-Na
    Wang, Rui
    Zhang, Xiao-Yu
    Li, Chang-Guo
    Zhong, Min
    Li, Yu-Hao
    PROCEEDINGS OF THE 38TH CHINESE CONTROL CONFERENCE (CCC), 2019, : 2307 - 2311