A quay crane productivity predictive model for building accurate quay crane schedules

被引:5
|
作者
Chargui, Kaoutar [1 ]
Zouadi, Tarik [2 ]
El Fallahi, Abdellah [1 ]
Reghioui, Mohamed [1 ]
Aouam, Tarik [2 ,3 ]
机构
[1] Univ Abdelmalek Essaadi, Natl Sch Appl Sci Tetouan, MOSIL Res Team, Tetouan, Morocco
[2] Int Univ Rabat, Rabat Business Sch, BEAR Lab, Sale, Morocco
[3] Univ Ghent, Fac Econ & Business Adm, Ghent, Belgium
来源
SUPPLY CHAIN FORUM | 2021年 / 22卷 / 02期
关键词
Quay crane productivity; neural networks; quay crane scheduling;
D O I
10.1080/16258312.2020.1831889
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
The efficient management of maritime logistics operations improves the performance of global supply chains. An important issue in container terminal operations is the scheduling of quay cranes (QCs), which is affected by the productivity rate of QCs. This productivity rate depends on the type of tasks to be completed by QCs on any given vessel. In this paper, we propose an artificial neural network (ANN) model with a variable neighbourhood search (VNS) as a training algorithm to build a productivity rate predictive model. This model considers several predictors depending on the type of containers in the vessel and the expected equipment downtime. We also study how QC scheduling is impacted by the productivity rate of QCs. The proposed predictive model and a moving average model are used to estimate the productivity rate, which is then taken as input to the QC scheduling optimisation model. Results show that when the proposed predictive model is used, QC schedules are closer to those generated using real data obtained from our container terminal partner.
引用
收藏
页码:136 / 156
页数:21
相关论文
共 50 条
  • [21] THE INTEGRATED SCHEDULING OF QUAY CRANE AND YARD TRUCK
    Ting, Shang Xiao
    Xin, Cao Jin
    Bin, Jia
    2018 37TH CHINESE CONTROL CONFERENCE (CCC), 2018, : 2271 - 2277
  • [22] The Quay Crane Scheduling Problem with Time Windows
    Meisel, Frank
    NAVAL RESEARCH LOGISTICS, 2011, 58 (07) : 619 - 636
  • [23] The Quay Crane Scheduling Problem With Stability Constraints
    Zhang, Zizhen
    Liu, Ming
    Lee, Chung-Yee
    Wang, Jiahai
    IEEE TRANSACTIONS ON AUTOMATION SCIENCE AND ENGINEERING, 2018, 15 (03) : 1399 - 1412
  • [24] Dynamic berth and quay crane allocation for multiple berth positions and quay cranes
    Cahyono, R. T.
    Flonk, E. J.
    Jayawardhana, B.
    2015 EUROPEAN CONTROL CONFERENCE (ECC), 2015, : 3262 - 3267
  • [25] QUAY CRANE FAILURE ANALYSIS WITH FMEA METHOD
    Babeli, Karla
    Hess, Svjetlana
    Hess, Mirano
    ZBORNIK VELEUCILISTA U RIJECI-JOURNAL OF THE POLYTECHNICS OF RIJEKA, 2022, 10 (01): : 423 - 437
  • [26] A Method of Quay Crane Scheduling For Container Terminals
    Ning Zhao
    Mi Weijian
    Xue Bao
    NATURAL RESOURCES AND SUSTAINABLE DEVELOPMENT II, PTS 1-4, 2012, 524-527 : 824 - 827
  • [27] Mathematical model for quay crane assignment problem with tidal constraints
    Arango Pastrana, Carlos Alberto
    Vidales-Velez, Cristhian
    Molina Agudelo, Jhon Edward
    Bravo Bastidas, Juan Jose
    Vargas Acuna, Leidy Carolina
    INGE CUC, 2021, 17 (01) : 177 - 187
  • [28] Modeling the productivity and stability of a terminal operation system with quay crane double cycling
    Zhang, Xiaoju
    Zeng, Qingcheng
    Sheu, Jiuh-Biing
    TRANSPORTATION RESEARCH PART E-LOGISTICS AND TRANSPORTATION REVIEW, 2019, 122 : 181 - 197
  • [29] Optimization and Evaluation of Tandem Quay Crane Performance
    Huang, Shell Ying
    Li, Ya
    2017 4TH INTERNATIONAL CONFERENCE ON SYSTEMS AND INFORMATICS (ICSAI), 2017, : 637 - 642
  • [30] Research on new structural quay container crane
    Jiangsu Maritime Institute, Nanjing 210016, China
    Adv. Mater. Res., (91-94):