Project scheduling with time-varying resource constraints

被引:52
|
作者
Klein, R [1 ]
机构
[1] Tech Univ Darmstadt, D-64289 Darmstadt, Germany
关键词
D O I
10.1080/00207540050176094
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
With industrial projects increasing in complexity and size, determining realizable schedules that efficiently utilize limited resources represents one of the most challenging project management tasks. In this context, the well-known resource-constrained project scheduling problem has been extensively studied. However, due to its restrictive assumptions, it allows only partial modelling of real-world scheduling problems. Therefore, this paper deals with a generalized version that considers more evolved types of precedence relationships as well as time-varying resource availabilities, e.g. due to maintenance or vacations. For this problem, appropriate heuristic solution methods, based on priority rules and tabu search, are proposed and evaluated concerning their effectiveness.
引用
收藏
页码:3937 / 3952
页数:16
相关论文
共 50 条
  • [1] Multiobjective Resource-Constrained Project Scheduling with a Time-Varying Number of Tasks
    Abello, Manuel Blanco
    Michalewicz, Zbigniew
    [J]. SCIENTIFIC WORLD JOURNAL, 2014,
  • [2] Scheduling project with stochastic durations and time-varying resource requests: A metaheuristic approach
    Rahman, Humyun Fuad
    Chakrabortty, Ripon K.
    Ryan, Michael J.
    [J]. COMPUTERS & INDUSTRIAL ENGINEERING, 2021, 157
  • [3] Multicast Scheduling in Time-Varying Wireless Networks with Delay Constraints
    Ying, Kai
    Yu, Hui
    Luo, Hanwen
    [J]. 2013 IEEE INTERNATIONAL CONFERENCE ON COMMUNICATIONS (ICC), 2013, : 5473 - 5477
  • [4] PROJECT SCHEDULING WITH RESOURCE CONSTRAINTS
    DIKE, SH
    [J]. IEEE TRANSACTIONS ON ENGINEERING MANAGEMENT, 1964, 11 (04) : 155 - 157
  • [5] Interval Matching Algorithm for Task Scheduling with Time Varying Resource Constraints
    Li, Weiguan
    Li, Jialun
    Long, Yujie
    Wu, Weigang
    [J]. 2022 18TH INTERNATIONAL CONFERENCE ON MOBILITY, SENSING AND NETWORKING, MSN, 2022, : 942 - 947
  • [6] ON THE PROJECT SCHEDULING UNDER RESOURCE CONSTRAINTS
    Shih, Neng-Hui
    [J]. JOURNAL OF INDUSTRIAL AND PRODUCTION ENGINEERING, 2006, 23 (06) : 494 - 500
  • [7] ALGORITHMS FOR PROJECT SCHEDULING WITH RESOURCE CONSTRAINTS
    ELSAYED, EA
    [J]. INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1982, 20 (01) : 95 - 103
  • [8] Optimal Resource Allocation in Time-Varying Vehicular Networks with Delay Constraints
    Fan, Xiying
    Fu, Bin
    [J]. WIRELESS ALGORITHMS, SYSTEMS, AND APPLICATIONS, WASA 2021, PT II, 2021, 12938 : 390 - 401
  • [9] Project scheduling with resource capacities and requests varying with time: a case study
    Sönke Hartmann
    [J]. Flexible Services and Manufacturing Journal, 2013, 25 : 74 - 93
  • [10] Project scheduling with resource capacities and requests varying with time: a case study
    Hartmann, Soenke
    [J]. FLEXIBLE SERVICES AND MANUFACTURING JOURNAL, 2013, 25 (1-2) : 74 - 93