Project scheduling with time-varying resource constraints

被引:52
|
作者
Klein, R [1 ]
机构
[1] Tech Univ Darmstadt, D-64289 Darmstadt, Germany
关键词
D O I
10.1080/00207540050176094
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
With industrial projects increasing in complexity and size, determining realizable schedules that efficiently utilize limited resources represents one of the most challenging project management tasks. In this context, the well-known resource-constrained project scheduling problem has been extensively studied. However, due to its restrictive assumptions, it allows only partial modelling of real-world scheduling problems. Therefore, this paper deals with a generalized version that considers more evolved types of precedence relationships as well as time-varying resource availabilities, e.g. due to maintenance or vacations. For this problem, appropriate heuristic solution methods, based on priority rules and tabu search, are proposed and evaluated concerning their effectiveness.
引用
收藏
页码:3937 / 3952
页数:16
相关论文
共 50 条
  • [31] Project scheduling under partially renewable resource constraints
    Böttcher, J
    Drexl, A
    Kolisch, R
    Salewski, F
    [J]. MANAGEMENT SCIENCE, 1999, 45 (04) : 543 - 559
  • [32] On the project scheduling problem under stored resource constraints
    Gimadi, EK
    Sevastianov, SV
    Zalyubovsky, VV
    [J]. ETFA 2001: 8TH IEEE INTERNATIONAL CONFERENCE ON EMERGING TECHNOLOGIES AND FACTORY AUTOMATION, VOL 2, PROCEEDINGS, 2001, : 703 - 705
  • [33] PROJECT SCHEDULING WITH RESOURCE CONSTRAINTS - A BRANCH AND BOUND APPROACH
    CHRISTOFIDES, N
    ALVAREZVALDES, R
    TAMARIT, JM
    [J]. EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1987, 29 (03) : 262 - 273
  • [34] Modeling Block Structured Project Scheduling with Resource Constraints
    Badica, Amelia
    Badica, Costin
    Logofatu, Doina
    Buligiu, Ion
    Ciora, Liviu
    [J]. LARGE-SCALE SCIENTIFIC COMPUTING (LSSC 2019), 2020, 11958 : 484 - 492
  • [35] Solution algorithms for the project selection and scheduling problem with resource constraints and time dependent returns
    Ghahremani, Pezhman
    Naderi, Bahman
    [J]. International Journal of Industrial and Systems Engineering, 2015, 19 (03) : 348 - 363
  • [36] Scheduling algorithms for time-varying downlink channels
    Jang, Edward W.
    Cho, Younggeun
    Choi, Ji-Woong
    Cioffi, John M.
    [J]. IEEE TRANSACTIONS ON WIRELESS COMMUNICATIONS, 2008, 7 (06) : 2063 - 2068
  • [37] Vehicle scheduling problems with time-varying speed
    Park, YB
    Song, SH
    [J]. COMPUTERS & INDUSTRIAL ENGINEERING, 1997, 33 (3-4) : 853 - 856
  • [38] Adaptive scheduling and coding for time-varying links
    Cao, YX
    Li, VOK
    [J]. 2003 INTERNATIONAL CONFERENCE ON COMMUNICATION TECHNOLOGY, VOL 1 AND 2, PROCEEDINGS, 2003, : 1384 - 1387
  • [39] Time-varying shortest path problems with constraints
    Cai, X
    Kloks, T
    Wong, CK
    [J]. NETWORKS, 1997, 29 (03) : 141 - 149
  • [40] Time-varying maximum transition run constraints
    Poo, TL
    Marcus, BH
    [J]. 2005 IEEE INTERNATIONAL SYMPOSIUM ON INFORMATION THEORY (ISIT), VOLS 1 AND 2, 2005, : 1468 - 1472