Project scheduling with time-varying resource constraints

被引:52
|
作者
Klein, R [1 ]
机构
[1] Tech Univ Darmstadt, D-64289 Darmstadt, Germany
关键词
D O I
10.1080/00207540050176094
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
With industrial projects increasing in complexity and size, determining realizable schedules that efficiently utilize limited resources represents one of the most challenging project management tasks. In this context, the well-known resource-constrained project scheduling problem has been extensively studied. However, due to its restrictive assumptions, it allows only partial modelling of real-world scheduling problems. Therefore, this paper deals with a generalized version that considers more evolved types of precedence relationships as well as time-varying resource availabilities, e.g. due to maintenance or vacations. For this problem, appropriate heuristic solution methods, based on priority rules and tabu search, are proposed and evaluated concerning their effectiveness.
引用
收藏
页码:3937 / 3952
页数:16
相关论文
共 50 条
  • [41] Time-varying maximum transition run constraints
    Poo, T. Lei
    Marcus, Brian H.
    [J]. IEEE TRANSACTIONS ON INFORMATION THEORY, 2006, 52 (10) : 4464 - 4480
  • [42] Vehicle motion planning with time-varying constraints
    Cerven, WT
    Bullo, F
    Coverstone, VL
    [J]. JOURNAL OF GUIDANCE CONTROL AND DYNAMICS, 2004, 27 (03) : 506 - 509
  • [43] Scheduling to Minimize Age of Information in Multi-State Time-Varying Networks with Power Constraints
    Tang, Haoyue
    Wang, Jintao
    Song, Linqi
    Song, Jian
    [J]. 2019 57TH ANNUAL ALLERTON CONFERENCE ON COMMUNICATION, CONTROL, AND COMPUTING (ALLERTON), 2019, : 1198 - 1205
  • [44] Fair Resource Allocation with Varying Time Constraints
    Ramanath, Sreenath
    Altman, Eitan
    [J]. 2018 10TH INTERNATIONAL CONFERENCE ON COMMUNICATION SYSTEMS & NETWORKS (COMSNETS), 2018, : 432 - 434
  • [45] Prophet: Scheduling Executors with Time-varying Resource Demands on Data-Parallel Computation Frameworks
    Xu, Guoyao
    Xu, Cheng-Zhong
    Jiang, Song
    [J]. 2016 IEEE INTERNATIONAL CONFERENCE ON AUTONOMIC COMPUTING (ICAC), 2016, : 45 - 54
  • [46] Resource Scheduling for Mobility Scenarios with Time Constraints
    Petri, Marcelo
    Kniess, Janine
    Parpinelli, Rafael Stubs
    [J]. 2018 XLIV LATIN AMERICAN COMPUTER CONFERENCE (CLEI 2018), 2018, : 184 - 191
  • [47] PREEMPTIVE SCHEDULING UNDER TIME AND RESOURCE CONSTRAINTS
    ZHAO, W
    RAMAMRITHAM, K
    STANKOVIC, JA
    [J]. IEEE TRANSACTIONS ON COMPUTERS, 1987, 36 (08) : 949 - 960
  • [48] Robustness analysis of uncertain time-varying systems using integral quadratic constraints with time-varying multipliers
    [J]. Farhood, Mazen (farhood@vt.edu), 1600, John Wiley and Sons Ltd (31):
  • [49] Robustness analysis of uncertain time-varying systems using integral quadratic constraints with time-varying multipliers
    Fry, J. Micah
    Abou Jaoude, Dany
    Farhood, Mazen
    [J]. INTERNATIONAL JOURNAL OF ROBUST AND NONLINEAR CONTROL, 2021, 31 (03) : 733 - 758
  • [50] PROJECT SCHEDULING WITH RESOURCE CONSTRAINTS USING BRANCH AND BOUND METHODS
    WILLIS, RJ
    HASTINGS, NAJ
    [J]. OPERATIONAL RESEARCH QUARTERLY, 1976, 27 (02) : 341 - 349