A Multi-time Scale Tie-line Energy and Reserve Allocation Model Considering Wind Power Uncertainties for Multi-area Systems

被引:17
|
作者
Xu, Jian [1 ]
Liao, Siyang [1 ]
Jiang, Haiyan [2 ]
Zhang, Danning [3 ]
Sun, Yuanzhang [1 ]
Ke, Deping [1 ]
Li, Xiong [1 ]
Yang, Jun [1 ]
Peng, Xiaotao [1 ]
Yao, Liangzhong [1 ]
机构
[1] Wuhan Univ, Sch Elect Engn & Automat, Wuhan 430072, Peoples R China
[2] State Grid Suzhou City & Energy Res Inst, Suzhou 215000, Peoples R China
[3] State Grid Zhengzhou Elect Power Supply Co, Zhengzhou 450000, Peoples R China
来源
基金
中国国家自然科学基金;
关键词
Energy and reserve allocation; hierarchical control structure; multi-area system; multi-time scale economic dispatch; wind power; REGRESSION NEURAL-NETWORK;
D O I
10.17775/CSEEJPES.2020.00620
中图分类号
TE [石油、天然气工业]; TK [能源与动力工程];
学科分类号
0807 ; 0820 ;
摘要
Continued expansion of the power grid and the increasing proportion of wind power centralized integration leads to requirements in sharing both energy and reserves among multiple areas under a hierarchical control structure, which successively requires a correction between schedule plans within multi-time scale. In order to address this problem, this paper develops an information integration method integrating complicated relationships among fuel cost, total thermal power output, reserve capacity, owned reserves and expectations of load shedding and wind curtailment, into three types of time-related relationship curves. Furthermore, a multi-time scale tieline energy and reserves allocation model is proposed, which contains two levels in the control structure, two time scales in dispatch sequence and multiple areas integrated within wind farms as scheduling objects. The efficiency of the proposed method is tested in a 9-bus test system and IEEE 118-bus system. The results show that a cross-regional control center is able to approach the optimal scheduling results of the whole system with the integrated uploaded relationship curves. The proposed model not only relieves energy and reserve shortages in partial areas but also allocates them to more urgent need areas in a high effectivity manner in both day-ahead and intraday time scales.
引用
收藏
页码:677 / 687
页数:11
相关论文
共 50 条
  • [31] Estimating unobservable machines in multi-area power systems considering model imperfections
    ter Vehn, Anton
    Nordstrom, Lars
    2023 IEEE BELGRADE POWERTECH, 2023,
  • [32] A Fully Distributed Optimization Method for Reserve Capacity of Multi-Area Interconnected Power Systems Considering Reserve Sharing
    Xiang, Li
    Shao, Shibiao
    Wu, Jiang
    Gao, Feng
    Feng, Xue
    Wang, Jiahua
    2021 PROCEEDINGS OF THE 40TH CHINESE CONTROL CONFERENCE (CCC), 2021, : 1785 - 1790
  • [33] Multi-time scale economic regulation model of virtual power plant considering multiple uncertainties of source, load and storag
    Dou, Zhenlan
    Zhang, Chunyan
    Duan, Chuanxu
    Wen, Xuan
    Sun, Chen
    JOURNAL OF COMPUTATIONAL METHODS IN SCIENCES AND ENGINEERING, 2024, 24 (02) : 935 - 953
  • [34] Dynamic reserve demand estimation model and cost-effectivity oriented reserve allocation strategy for multi-area system integrated with wind power
    Jiang, Haiyan
    Xu, Jian
    Sun, Yuanzhang
    Liao, Siyang
    Ke, Deping
    Jiang, Yibo
    Tang, Bowen
    IET GENERATION TRANSMISSION & DISTRIBUTION, 2018, 12 (07) : 1606 - 1620
  • [35] Frequency and Tie-line Power control of Two Area Network With Multi Sources of Generators
    Singh, Gaganprit
    Sinha, S. K.
    2016 7TH INDIA INTERNATIONAL CONFERENCE ON POWER ELECTRONICS (IICPE), 2016,
  • [36] Multi-time scale reliability evaluation of wind power converter IGBT considering fatigue damage
    Wang C.
    He Y.
    Wang C.
    Li L.
    Wu X.
    Li J.
    Dianli Zidonghua Shebei/Electric Power Automation Equipment, 2021, 41 (03): : 173 - 178
  • [37] Multi-Area Security-Constrained Unit Commitment and Reserve Allocation with Wind Generators
    Mogo, Jules Bonaventure
    Kamwa, Innocent
    Cros, Jerome
    2016 IEEE CANADIAN CONFERENCE ON ELECTRICAL AND COMPUTER ENGINEERING (CCECE), 2016,
  • [38] Non-iterative multi-area coordinated energy and reserve allocation model for hybrid AC/DC power systems with flexible frequency operation
    Chen, Rui
    Xu, Jian
    Zhang, Hengrong
    Sun, Yuanzhang
    Liao, Siyang
    Ke, Deping
    Wang, Bo
    Zhang, Zhe
    Wu, Yuhui
    ENERGY REPORTS, 2023, 9 : 1077 - 1085
  • [39] A Multi-time Scale Source–Load Scheduling Method for Power Systems with Wind Power Considering Typical Industrial Production Processes
    Ning Liang
    Jiangyun Zhang
    Feng Zheng
    Zhengnan Pan
    Journal of Electrical Engineering & Technology, 2024, 19 (2) : 1033 - 1049
  • [40] Frequency and tie-line power awareness in eco-AGC of multi-area power system with SSO-based fractional order controller
    Sahu P.C.
    Prusty R.C.
    International Journal of Power and Energy Conversion, 2020, 11 (02) : 200 - 221