A Multi-time Scale Tie-line Energy and Reserve Allocation Model Considering Wind Power Uncertainties for Multi-area Systems

被引:17
|
作者
Xu, Jian [1 ]
Liao, Siyang [1 ]
Jiang, Haiyan [2 ]
Zhang, Danning [3 ]
Sun, Yuanzhang [1 ]
Ke, Deping [1 ]
Li, Xiong [1 ]
Yang, Jun [1 ]
Peng, Xiaotao [1 ]
Yao, Liangzhong [1 ]
机构
[1] Wuhan Univ, Sch Elect Engn & Automat, Wuhan 430072, Peoples R China
[2] State Grid Suzhou City & Energy Res Inst, Suzhou 215000, Peoples R China
[3] State Grid Zhengzhou Elect Power Supply Co, Zhengzhou 450000, Peoples R China
来源
基金
中国国家自然科学基金;
关键词
Energy and reserve allocation; hierarchical control structure; multi-area system; multi-time scale economic dispatch; wind power; REGRESSION NEURAL-NETWORK;
D O I
10.17775/CSEEJPES.2020.00620
中图分类号
TE [石油、天然气工业]; TK [能源与动力工程];
学科分类号
0807 ; 0820 ;
摘要
Continued expansion of the power grid and the increasing proportion of wind power centralized integration leads to requirements in sharing both energy and reserves among multiple areas under a hierarchical control structure, which successively requires a correction between schedule plans within multi-time scale. In order to address this problem, this paper develops an information integration method integrating complicated relationships among fuel cost, total thermal power output, reserve capacity, owned reserves and expectations of load shedding and wind curtailment, into three types of time-related relationship curves. Furthermore, a multi-time scale tieline energy and reserves allocation model is proposed, which contains two levels in the control structure, two time scales in dispatch sequence and multiple areas integrated within wind farms as scheduling objects. The efficiency of the proposed method is tested in a 9-bus test system and IEEE 118-bus system. The results show that a cross-regional control center is able to approach the optimal scheduling results of the whole system with the integrated uploaded relationship curves. The proposed model not only relieves energy and reserve shortages in partial areas but also allocates them to more urgent need areas in a high effectivity manner in both day-ahead and intraday time scales.
引用
收藏
页码:677 / 687
页数:11
相关论文
共 50 条
  • [12] Coordinated scheduling of generators and tie lines in multi-area power systems under wind energy uncertainty
    Zhang, Heng
    Hu, Xiao
    Cheng, Haozhong
    Zhang, Shenxi
    Hong, Shaoyun
    Gu, Qingfa
    ENERGY, 2021, 222
  • [13] Probabilistic Load Flow for Power Systems with Wind Power Considering the Multi-time Scale Dispatching Strategy
    Qin, Chao
    Yu, Yixin
    Zeng, Yuan
    JOURNAL OF ELECTRICAL ENGINEERING & TECHNOLOGY, 2018, 13 (04) : 1494 - 1503
  • [14] A Time-Varying Hierarchical Load Frequency Control Method for Multi-area Power System with Wind Power Participation and HVDC Tie-Line based on MAS Structure
    Xilin Zhao
    Sili Gong
    Bo Fu
    Chufeng Gong
    Journal of Electrical Engineering & Technology, 2023, 18 : 1523 - 1537
  • [15] A Time-Varying Hierarchical Load Frequency Control Method for Multi-area Power System with Wind Power Participation and HVDC Tie-Line based on MAS Structure
    Zhao, Xilin
    Gong, Sili
    Fu, Bo
    Gong, Chufeng
    JOURNAL OF ELECTRICAL ENGINEERING & TECHNOLOGY, 2023, 18 (03) : 1523 - 1537
  • [16] Multi-time Scale Dispatching Strategy for EV Charging Considering Wind Power
    Bao, Yueshuang
    Huang, Qilong
    Qiu, Zhifeng
    Wang, Chunsheng
    Gui, Weihua
    PROCEEDINGS OF THE 36TH CHINESE CONTROL CONFERENCE (CCC 2017), 2017, : 2978 - 2984
  • [17] Multi-time scale energy management of microgrid considering the uncertainties in both supply and demand
    School of Electrical Engineering, Zhengzhou University, Zhengzhou
    450001, China
    Energy Rep., (10372-10384): : 10372 - 10384
  • [18] Multi-time scale energy management of microgrid considering the uncertainties in both supply and demand
    Cheng, Zhiping
    Jia, Dongqiang
    Li, Zhongwen
    Xu, Shuai
    Zhi, Changyi
    Wu, Long
    ENERGY REPORTS, 2022, 8 : 10372 - 10384
  • [19] Multi-time Scale Transients in Power-electronized Power Systems Considering Multi-time Scale Switching Control Schemes of Power Electronics Apparatus
    Hu J.
    Yuan X.
    Cheng S.
    Zhongguo Dianji Gongcheng Xuebao/Proceedings of the Chinese Society of Electrical Engineering, 2019, 39 (18): : 5457 - 5467
  • [20] Multi-time scale optimal scheduling of regional integrated energy system considering wind power correlation
    Chen Z.
    Wen B.
    Zhu Z.
    Dianli Zidonghua Shebei/Electric Power Automation Equipment, 2023, 43 (08): : 25 - 32