Using 4D BIM to assess construction risks during the design phase

被引:59
|
作者
Jin, Ziyu [1 ]
Gambatese, John [1 ]
Liu, Ding [1 ]
Dharmapalan, Vineeth [2 ]
机构
[1] Oregon State Univ, Sch Civil & Construct Engn, Corvallis, OR 97331 USA
[2] Univ Texas Austin, Dept Civil Architectural & Environm Engn, Austin, TX 78712 USA
关键词
Risk management; Case study; Building information modelling; Construction planning; Construction safety; SAFETY HAZARD IDENTIFICATION; INFORMATION MODELING BIM; PREVENTION; FRAMEWORK; CHECKING;
D O I
10.1108/ECAM-09-2018-0379
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Purpose The prevention through design (PtD) concept has been widely recognized as one of the most effective approaches to eliminate or reduce construction site hazards. It encourages engineers and architects to consider occupational safety and health during the planning and design phases. Nevertheless, the implementation of PtD is often inhibited because designers lack adequate knowledge about construction safety and the construction process, and limited design-for-safety tools and procedures are available for designers to use. The purpose of this paper is to provide designers a tool for assessing construction risks during early phases of multistory building projects at an activity level and on a daily basis in a 4D environment. By using the tool, proactive measures could be taken in the design and planning phase to reduce site hazards. Design/methodology/approach The proposed method consists of four steps including risk quantification at a design element level, 4D model integration with risk values, risk assessment, and design alternative selection and model acceptance. A case study was carried out to test and verify the proposed method. Findings The proposed tool has the capability to assess the safety risk for an entire multistory project and visualize safety risk in a particular time period, work space and task prior to construction. It benefits designers in conducting risk assessments and selecting design alternatives concerning safety. Contractors could also utilize the visualization and simulation results of the 4D model for site safety planning so that a range of risk mitigation strategies could be implemented during construction. Originality/value The study provides an innovative PtD tool targeting designers as primary end-users. The proposed tool helps designers assess construction risks and has potential to incorporate the top levels of the hierarchy of risk controls.
引用
收藏
页码:2637 / 2654
页数:18
相关论文
共 50 条
  • [1] Integrating 4D BIM and FDS to Simulate and Assess Fires in Buildings under Construction
    Sun, Qi
    Turkan, Yelda
    Fischer, Erica
    [J]. CONSTRUCTION RESEARCH CONGRESS 2022: COMPUTER APPLICATIONS, AUTOMATION, AND DATA ANALYTICS, 2022, : 977 - 986
  • [2] 4D BIM for Construction Logistics Management
    Whitlock, Kane
    Abanda, Fonbeyin Henry
    Manjia, Marcelline Blanche
    Pettang, Chrispin
    Nkeng, George Elambo
    [J]. CIVILENG, 2021, 2 (02): : 325 - 348
  • [3] Physical Distancing Analytics for Construction Planning Using 4D BIM
    Hosny, Abdelhady
    Nik-Bakht, Mazdak
    Moselhi, Osama
    [J]. JOURNAL OF COMPUTING IN CIVIL ENGINEERING, 2022, 36 (04)
  • [4] Impacts of 4D BIM on construction project performance
    Crowther, James
    Ajayi, Saheed O.
    [J]. INTERNATIONAL JOURNAL OF CONSTRUCTION MANAGEMENT, 2021, 21 (07) : 724 - 737
  • [5] 4D BIM for Construction Planning and Environmental Planning
    Sheina, Svetlana
    Seraya, Ekaterina
    Krikunov, Viktor
    Saltykov, Nikita
    [J]. INTERNATIONAL SCIENCE CONFERENCE SPBWOSCE-2018: BUSINESS TECHNOLOGIES FOR SUSTAINABLE URBAN DEVELOPMENT, 2019, 110
  • [6] Monitoring Construction Progress Based on 4D BIM Technology
    Chen, Jingjing
    Wu, Juan
    Qu, Yan
    [J]. 6TH INTERNATIONAL CONFERENCE ON ENVIRONMENTAL SCIENCE AND CIVIL ENGINEERING, 2020, 455
  • [7] Investigating the Human Errors in 4D BIM Construction Scheduling
    Kandregula, Shravan Kumar
    Le, Tuyen
    [J]. CONSTRUCTION RESEARCH CONGRESS 2020: PROJECT MANAGEMENT AND CONTROLS, MATERIALS, AND CONTRACTS, 2020, : 750 - 757
  • [8] Integrating 4D BIM and GIS for Construction Supply Chain Management
    Deng, Yichuan
    Gan, Vincent J. L.
    Das, Moumita
    Cheng, Jack C. P.
    Anumba, Chimay
    [J]. JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2019, 145 (04)
  • [9] 4D BIM model adaptation based on construction progress monitoring
    Sigalov, K.
    Koenig, M.
    [J]. EWORK AND EBUSINESS IN ARCHITECTURE, ENGINEERING AND CONSTRUCTION, 2018, : 337 - 344
  • [10] Evaluation of 4D BIM tools applicability in construction planning efficiency
    Martins, Savio Santana
    Jorge Evangelista, Ana Catarina
    Hammad, Ahmed W. A.
    Tam, Vivian W. Y.
    Haddad, Assed
    [J]. INTERNATIONAL JOURNAL OF CONSTRUCTION MANAGEMENT, 2022, 22 (15) : 2987 - 3000