Investigating the Human Errors in 4D BIM Construction Scheduling

被引:0
|
作者
Kandregula, Shravan Kumar [1 ]
Le, Tuyen [1 ]
机构
[1] Clemson Univ, Glenn Dept Civil Engn Construct Engn & Management, Clemson, SC 29634 USA
关键词
Building Information Modeling; BIM; 4D-BIM; 4D-Visualization; 4D-Scheduling; Construction Scheduling; Scheduling; Construction Planning and Scheduling; Human Errors; Human Error Taxonomy (HET); Cognition error theories;
D O I
暂无
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Four-dimensional building information modeling (4D-BIM or 4D scheduling) is well known to benefit the construction industry in many ways. 4D-BIM is an effective scheduling technique which integrates traditional scheduling methods and advanced visualization of the construction sequences in a 3D environment. Despite the potential benefits of 4D-BIM to improve scheduling quality, errors still often occur in construction schedules. The objective of this research is to understand the association between human errors and computer-aided scheduling. This paper focuses on examining the current practices of 4D-scheduling to gain insights on potential errors during the process of scheduling. Furthermore, the paper discusses a set of root causes of scheduling errors based on different types of human errors in cognition error theories. The research determined human errors through an integrated approach of literature review and a survey. The results of this study are expected to provide new knowledge about what human errors that commonly occur during the scheduling processing using BIM and their root causes.
引用
收藏
页码:750 / 757
页数:8
相关论文
共 50 条
  • [1] Revolutionising the 4D BIM Process to Support Scheduling Requirements in Modular Construction
    Mayouf, Mohammad
    Jones, Jamie
    Elghaish, Faris
    Emam, Hassan
    Ekanayake, E. M. A. C.
    Ashayeri, Ilnaz
    SUSTAINABILITY, 2024, 16 (02)
  • [2] 4D BIM for Construction Logistics Management
    Whitlock, Kane
    Abanda, Fonbeyin Henry
    Manjia, Marcelline Blanche
    Pettang, Chrispin
    Nkeng, George Elambo
    CIVILENG, 2021, 2 (02): : 325 - 348
  • [3] Decomposition of BIM objects for scheduling and 4D simulation
    Tulke, J.
    Nour, M.
    Beucke, K.
    EWORK AND EBUSINESS IN ARCHITECTURE, ENGINEERING AND CONSTRUCTIO N, 2009, : 653 - +
  • [4] Impacts of 4D BIM on construction project performance
    Crowther, James
    Ajayi, Saheed O.
    INTERNATIONAL JOURNAL OF CONSTRUCTION MANAGEMENT, 2021, 21 (07) : 724 - 737
  • [5] 4D BIM for Construction Planning and Environmental Planning
    Sheina, Svetlana
    Seraya, Ekaterina
    Krikunov, Viktor
    Saltykov, Nikita
    INTERNATIONAL SCIENCE CONFERENCE SPBWOSCE-2018: BUSINESS TECHNOLOGIES FOR SUSTAINABLE URBAN DEVELOPMENT, 2019, 110
  • [6] Construction managers embrace 4D BIM for safety
    Sawyer, Tom, 1600, McGraw-Hill Companies (272):
  • [7] Monitoring Construction Progress Based on 4D BIM Technology
    Chen, Jingjing
    Wu, Juan
    Qu, Yan
    6TH INTERNATIONAL CONFERENCE ON ENVIRONMENTAL SCIENCE AND CIVIL ENGINEERING, 2020, 455
  • [8] Integrating 4D BIM and GIS for Construction Supply Chain Management
    Deng, Yichuan
    Gan, Vincent J. L.
    Das, Moumita
    Cheng, Jack C. P.
    Anumba, Chimay
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2019, 145 (04)
  • [9] Physical Distancing Analytics for Construction Planning Using 4D BIM
    Hosny, Abdelhady
    Nik-Bakht, Mazdak
    Moselhi, Osama
    JOURNAL OF COMPUTING IN CIVIL ENGINEERING, 2022, 36 (04)
  • [10] 4D BIM model adaptation based on construction progress monitoring
    Sigalov, K.
    Koenig, M.
    EWORK AND EBUSINESS IN ARCHITECTURE, ENGINEERING AND CONSTRUCTION, 2018, : 337 - 344